Product Information:

The Growatt SPH TL3 BH-UP Series is an energy storage machine
produced by Shenzhen Growatt New Energy Technology Co., LTD. It is
a hybrid inverter that is designed for grid-connected systems. The
system consists of PV modules, SPH inverter, battery, utility grid,
and other components. The inverter has a compact size and is
equipped with various safety measures to ensure user safety.

Product Usage Instructions:

To install and operate the Growatt SPH TL3 BH-UP Series, please
follow the below instructions:

Installation:

  1. Ensure that you have all the necessary tools and equipment for
    installation.
  2. Refer to the label explanation in the manual for better
    understanding.
  3. Take note of the size and weight of the unit for installation
    planning.
  4. Follow the basic installation requirements provided in the
    manual.
  5. Connect the LAN line using the RJ 45 terminal sequence.
  6. Refer to the installation instructions for detailed steps.
  7. Choose the appropriate SPH system connection mode.

Commissioning:

  1. Follow the commissioning process provided in the manual to
    ensure proper functioning of the SPH system.
  2. Select the desired operation modes based on your
    requirements.
  3. Set the country settings as per your location.
  4. Familiarize yourself with the display and button
    functionalities.
  5. Ensure proper communication setup for the system.

Start-up and Shut Down:

  1. Follow the start-up process to activate the SPH system.
  2. When required, disconnect the SPH system following the provided
    guidelines.

Installation Environment, Maintenance, and Cleaning:

Pay attention to the installation environment to ensure optimal
performance. Regular maintenance and cleaning are required to keep
the SPH inverter in good condition. Refer to the manual for
specific instructions on these aspects.

Fault Removal:

If any faults occur, refer to the fault removal section in the
manual for troubleshooting steps.

Decommissioning:

If you need to dismantle, pack, store, or dispose of the SPH
inverter, follow the instructions provided in the decommissioning
section of the manual.

Contact Information:

If you have any further questions or need assistance, please
contact Shenzhen Growatt New Energy at:

T: +86 0755 2747 1942

E: [email protected]

W: www.ginverter.com

Download Manual

Growatt New Energy

Shenzhen Growatt New Energy CO.,LTD No.28 Guangming Road, Shiyan Street, Bao’an District, Shenzhen, P.R.China T +86 0755 2747 1942 E [email protected] W www.ginverter.com
GR-UM-226-A-01

Installation & Operation Manual

Contents

1 Brief Introduction

1.1 Preface
1.2 Target Group 1.3 Product Description
1.4 Safety Instructions

2 Safety

2.1 Purpose Use
2.2 Safety Measure 2.3 Symbols introduction on the SPH inverter

3 Product Description
4 Unpacking 5 Installation

3.1 Growatt SPH series inverter 3.2 Label Explanation 3.3 Size and weight 3.4 The advantage of the unit of Growatt SPH
5.1 Basic installation requirements 5.2 Installation requires tools and RJ 45 terminal sequence of the LAN line 5.3 Installation Instructions 5.4 SPH System Connection Mode

6 Commissioning 7 Start-up and shut down SPH system

6.1 Commissioning of SPH 6.2 Operation modes 6.3 Country setting 6.4 Display and button 6.5 Communication
7.1 Start-up the SPH system 7.2 Disconnect the SPH system

8 Attention of the installation environment, maintenance and cleaning
9 Fault removal
10 EU Declaration of Conformity

11 Decommissioning

11.1 Dismantling the energy storage 11.2 Packing the SPH inverter 11.3 Storing SPH inverter 11.4 Disposing of theSPH inverter

12 Product specification 13 Certificate

12.1 Growatt SPH series energy storage machine product specification 12.2 DC input terminal parameter 12.3 Torque 12.4 Appendix

14 Contact

1 Brief Introduction
1.1 Preface
This manual will provide the users who use the Growatt SPH TL3 BH-UP Series of Shenzhen Growatt New Energy Technology Co.,LTD(Short for Growatt as below) with the detailed product information and the installation instructions. Please read this manual carefully and put this manual on some place where is convenient to installation, operation, obtain. Any modifications of Growatt new energy, we will not notify the user.
1.2 Target Group
Growatt SPH TL3 BH-UP inverter must be installed by professional electrical personnel who have obtained the certification of the relevant departments. We have two kinds of energy storage machine for different battery one is for lithium battery and the other is for lead-acid battery, we suggest: customer should decide which kind of energy storage machine you want, Growatt can provide only lithium battery with energy storage machine, customer can choose lead-acid energy storage machine with no battery provide by Growatt while they can buy these battery from market easily. Especially if customer choose energy storage system with lithium battery(which must be provide by Growatt) but used for lead-acid battery or used lead-acid battery for lithium battery model, it will be dangerous. Installer can install energy storage machine of Growatt SPH TL3 BH-UP Series rapidly and troubleshooting, build communication system through read this manual carefully.If you have any questions in the process of installation, you can login in www.growatt.com and leave some message.Or you can call our 24-hour service hotline+86 0755 2747 1942.
1.3 Product Description
Growatt SPH TL3 BH-UP Series is used to store energy generated by the photovoltaic cell panels or energy from grid if it is allowed in the battery, also energy can be sent to power grid through SPH TL3 BH-UP for self consumption or when Grid power is lost, SPH TL3 BH-UP can be used as backup power. SPH series has six kinds of type: Y SPH 4000TL3 BH-UP Y SPH 5000TL3 BH-UP Y SPH 6000TL3 BH-UP Y SPH 7000TL3 BH-UP Y SPH 8000TL3 BH-UP Y SPH 10000TL3 BH-UP Note: we describe this series as “SPH” as below.
1

Overview:

Position A B C D E F G H I J K L M N O P Q R S T

Chart 1.1
Description LED of status display LCD screen Function button Ground point Breathable valve UPS output(off grid connection) RSD(do not open except by Professional staff) AC Grid (on grid connection) Rs485 communication interface(Reserved) Rs485 communication interface of meter2(Reserved) NTC: Lead-acid temperature sensor terminal Rj45 interface of DRMs(used only in Australia) Rs485 communication interface of meter1 CAN communication interface of Lithium battery USB interface PV switch PV input Battery terminal Dry contact Rs485 communication interface of meter2(Reserved)

2

1.4 Safety Instructions
1.Please be clear which kind of battery system you want, lithium battery system or leadacid battery system, if you choose the wrong system, SPH can’t work normally. 2.Please read this manual carefully before the installation, The company has the right not to quality assurance,If not according to the instructions of this manual for installation and cause equipment damage. 3.All the operation and connection please professional electrical or mechanical engineer. 4.During installation, Please don’t touch the other parts within the box. 5.All the electrical installation must comply with the local electrical safety standards. 6.If equipments needs to maintain, Please contact with local specify system installation and maintenance personnel. 7.Use the equipment to combined to grid needs to obtain the permission of local power supply department. 8.When install PV modules in the daytime, please turn off the PV switch, Otherwise it will be dangerous as high terminal voltage of modules in the sunshine.

2 Safety
2.1 Purpose Use
The system chart of SPH:
PV Array

Battery

DC Breaker

Electrical Grid

AC Breaker

Hybrid Inverter

Hybrid
Grid EPS
Breaker

AC Breaker

Sensor

Load

EPS Load

Hybrid

L1
2 L2 L3 N
Electic meter

15m

Chart 2.1 3

As shown above, a complete grid-connected system of SPH consists of PV modules, SPH inverter, battery, utility grid and other components.
Attention: As the system refer to battery use, We must make sure ventilation of the service environment and temperature control in order to prevent the danger of battery explosion, Battery recommended installation environment must be strictly in accordance with the specificationif the specification is IP20 environment, the pollution degree of the unit is PD2, meanwhile the temperature should be control in the 0-40 of indoor ventilation and the humidity should be 5%-85%. If the chosen PV modules needs to positive or negative ground connection, please contact with Growatt for technical support before installation.
2.2 Safety Measure

DANGER
Risk of high voltage Relevant operation for professional personnel. Please notice children, disabled, laypeople do not close. Supervise and make sure children don’t play near the installation position of energy storage machine.

DANGER
Risk of burns on the parts shell of SPH inverter During the work, Cover, shell around, radiator is likely to be hot.

CAUTION
SPH inverter exists radiation maybe affect health Don’t stay a long time within 20cm range from SPH inverter.

SPH inverter ground connection Please ensure SPH inverter ground connection is reliable for make sure people’s safety.

2.3 Symbols introduction on the SPH inverter

Symbol

Description

Caution: Risk of electrical shock!

Caution : hot surface!

4

Caution: risk of danger! Danger to life due to high voltage in SPH. There is residual voltage in SPH, SPH requires 5 minutes to discharge. Please wait 5 minutes before you open the upper lid or the DC lid. Protective conductor terminal
Direct Current(DC)
Alternating Current(AC) The machine complies with the requirements of the applicable CE guidelines
Refer to the operating instructions.

3 Product Description

3.1 Growatt SPH series inverter
Marks of SPH

Mark

Description

Explanation

Push-button

Operation of display screen and set system

Green light on Red light on Status symbol of SPH Green light blinking Red light blinking

SPH run normally fault state Alarm state Software updating

5

3.2 Label Explanation
Label contains the following information: for example SPH 10000TL3 BH-UP shows as below:
6

Description of label The type of product PV input data Max. PV voltage PV voltage range PV Isc Max. input current AC output/input data Max. output power Max. apparent power
Nominal output voltage
Max output current Nominal output Frequency Power factor range Stand alone data Nominal AC output power Nominal AC output voltage Nominal AC output Frequency Battery data Battery voltage range Max. charge and discharge current Type of battery Others Safety level Ingress Protection Operation Ambient Temperature Certificates Number
7

Growatt SPH 10000TL3 BH-UP
1000Vdc 120~1000Vdc 16.9A*2 13.5A*2
10000W 10000VA 3W/N/PE 230/400Vac 15.2A 50Hz/60Hz 0.8 leading~0.8 lagging
10000W 230/400Vac 50Hz/60Hz
100~550Vdc 25A Lithium / Lead-acid
Class IP65 -25~+60 ( For Australian models)

3.3 Size and weight

Chart 3.1

Growatt SPH TL3 BH-UP

A(mm) 453

B(mm) 505

C(mm) 198

weight(kg) 33

3.4 The advantage of the unit of Growatt SPH
Features below:
Ø All in one design. Can improve self consumption, back up and also pinch the valley. Ø Smart management, work mode can be set. Ø Safe battery used. Ø Easy installation. Ø Two mpp tracker input.
8

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals