Residential Heat Pump Aerotherm Re Series Heat Pump Water Heater User Manual

Aerotherm RE Series Heat Pump Water Heater

Product Information:

The product is a water heater that operates in Hybrid mode,
providing hot water efficiently through a heat pump. It requires
specific clearances for installation and is equipped with various
components such as an air filter, thermal expansion tank,
temperature & pressure relief valve, drain valve, and
condensate drain line. The installation may also require a separate
ducting kit for which the manual provides instructions.

Product Usage Instructions:

  1. Attention Installer:
  • Recommended clearances:
    • 7″ (17.8 cm) clearance should be maintained between any object
      and the rear and sides of the water heater for service access.
    • A minimum 8″ (20.3 cm) clearance above the water heater is
      required to remove the filter for cleaning and service access.
    • Clear access to the front of the water heater is
      recommended.
    • If less than 7″ (17.8 cm) clearance is available on one side,
      additional clearance must be provided on the opposite side for
      service access.
  • The hot and cold water plumbing and electrical connections
    should not obstruct the removal of the filter.
  • If a separate ducting kit is purchased, additional space is
    required above and to the rear of the water heater. Consult the
    ducting kit manual for specific instructions.
  • TYPICAL INSTALLATION:
    • Follow the recommended installation checklist:
    1. Verify Air Filter is installed.
    2. Ensure proper plumbing connections are in place, including a
      rigid drain line directed to a drain or condensate pump.
    3. Check that the Temperature & pressure relief valve is
      working and the drain line is completed per local code.
    4. Verify the electrical connection, ensuring 208/240 VAC to L1
      and L2 at the tank.
    5. Make sure the electrical connection does not prevent air filter
      removal.
  • Normal Startup Conditions:
    • Once the tank is full and power is energized, the following
      actions occur:
    1. 0 to 2 minutes: The unit goes through a self-check and displays
      a countdown to prevent compressor damage.
    2. 2 to 22 minutes: The compressor and fan turn on to ensure the
      tank is full of water (Dry-fire prevention algorithm).
    3. 22 minutes and beyond: The compressor and fan turn off, and the
      heating elements turn on. After initial heat-up, the elements turn
      off, and the compressor turns on. The water heater operates in
      Hybrid mode, providing an initial amount of hot water before
      switching to the efficient heat pump for the majority of
      heating.

    Attention Installer

    Recommended clearances:

    It is recommended to have a 7″ (17.8 cm) clearance between any

    object and the rear and sides of the water heater in the event

    service is needed. A minimum 8″ (20.3cm) clearance above the

    water heater to remove the filter for cleaning and for service

    access, and clear access to the front of the water heater, is

    recommended. Installations that require less than 7″ (17.8 cm)

    clearance on the right

    Cealertahrqaunackees

    straps are section in

    side also

    oarccreeaprtaobfleth(eseweatMerinhimeautmer

    Rfoerquired

    the Installation and Operations Manual for

    more information) In these cases, additional clearance must be

    provided on the opposite side of the unit to allow for service

    access. The hot and cold water plumbing and electrical

    connections must not interfere with the removal of the filter.

    If a separate ducting kit is purchased, additional space is required above and to the rear of the water heater for installation. Consult the ducting kit manual for specific instructions.

    8″ (20.3 cm)

    7″ (17.8 cm)

    Model appearance may vary.

    TYPICAL INSTALLATION

    Conduit to electrical junction box (use only copper conductors)

    Thermal expansion tank
    To cold water supply

    Hot water outlet to fixtures
    Union (suggested)

    Shut-off valve

    ¾” FNPT fitting to condensate drain pan

    Temperature & pressure relief valve

    Drain valve

    Condensate drain line

    To open drain, line should be at least 3/4″ ID and pitched for proper draining

    Relief valve discharge 6″ (15.2 cm) minimum from the floor

    Room size:
    Because this unit draws in air from the room to heat the water, the room must be at least 10′ x 10′ x 7′ (700ft³) [3.05m x 3.05m x 2.13m (19.82m³)] or larger. If the room is smaller there must be a louvered door or a ducting kit installed.
    Protect Unit:
    During installation cover and protect upper part of the unit from potential installation debris.

    Installation Checklist:

    1. Tank location: ­ Does room size require louvered door, ducting, or similar ventilation? 10′ x 10′ x 7′ (700 cu. ft.) or 240 square inches (0.15 m2) open air-flow area needed. ­ Back of unit away from wall by 7 inches (17.5 cm), and sides have at least 7 inches (17.5 cm) clearance. (Additional clearance for earthquake strap installations). ­ Front of unit is free and clear. ­ Is the water heater level? If no, add shims under the base of the unit to ensure proper function of sensors.
    2. Verify Air Filter is installed. (Located in packaging).

    3. Plumbing connections:

    ­ Does not prevent air filter removal.

    ­ No leaks after filling the tank with water, either when water is

    flowing or not.

    4.

    C­oMndaeinnsflaetxeiblilneeosr

    are in place: rigid drain line

    installed

    and

    directed

    to

    a

    drain

    or condensate pump. Reducer fittings are not recommended.

    5. Temperature and pressure-relief valve is working and drain line

    completed per local code.

    6. Electrical: Verify 208/240 VAC to L1 and L2 at tank.

    7. Electrical connection does not prevent air filter removal.

    8. Verify control panel displays 120°F (49°C) Hybrid mode. Assist user in how to adjust temperature and modes (see “Temperature Adjustment” section of the Installation and Operation Manual).

    Normal Startup Conditions:
    Once the tank is full and power is energized, you may experience the following:

    Elapsed Time
    0 to 2 minutes

    HEWH Actions
    Unit will go through self-check and display countdown.

    Comments This 2-minute off-time prevents compressor damage.

    2 to 22 Compressor and fan minutes turn on.

    This 20-minute period is used to ensure the tank is full of water (Dry-fire prevention algorithm).

    22 minutes and beyond

    Compressor and fan turn off, heating elements turn on. After initial heat-up, elements turn off and compressor turns on.

    The water heater is operating in Hybrid mode, quickly providing an initial amount of hot water before switching to the efficient heat pump for the majority of heating.

    NOTE: Heat Pump operating range is 35°F – 120°F (2°C-49°C).

    238-52325-00B 06/22
    Printed in USA

  • Documents / Resouces

    Download manual
    Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


    Related Manuals