Saunalife E6w Barrel Sauna Half Glass Window Instruction Manual

E6W Barrel Sauna Half Glass Window

Product Information

The Ergo-Series E6W Barrel Sauna Half Glass Window is a sauna
unit that measures 59 inches in diameter and 81 inches in height.
The product comes with a detailed list of parts and tools required
for installation. The sauna unit requires a circular saw, water
level, hammer, ratchet strap, extra hands, silicone gun (for
glass-wall models), drill, crescent wrench, utility knife, and
rubber mallet. The product also comes with Torx bits (T10, T15,
T20, T25) and a PH2 bit. The sauna unit features wooden front wall
installation and half-moon wall installation options. The product
has brackets inside and vents for proper ventilation.

Product Usage Instructions

  1. Read the manual before starting the construction process.
  2. Assemble the wooden front wall or half-moon wall according to
    the instructions provided in the manual.
  3. Join two boards together that will bridge the width of the A
    gap. It is recommended that the combined boards are approximately
    1/4 wider than the gap. If needed, trim the flat edge of the board
    to create the desired width.
  4. Fasten the two halves using screws.
  5. Use straps to support boards during installation.
  6. Apply waterproof silicone into the groove and pre-drill screw
    holes. Do not let screws touch glass while installing half-moon
    wall.
  7. Place the bands around the barrel on the outer side of the
    cradle and remove the straps.
  8. Follow the main installation manual for installing the sauna
    walls and brackets inside.
  9. Leave a 1/4 gap when tightening screws to leave room for
    adjustment when the outer bands (B) are installed.
  10. Remove all temporary braces once the installation is
    complete.

Ergo-Series E6W Barrel Sauna Half Glass Window 59D” x 81H”

Note: Please read manual before construction

Rev 4/2023

Front & Back Walls

E6W Barrel Sauna 59D” x 81H”

Details list.

1

A

2

3

6

6a 6b

6c 6d

10

63″ x 8″ x 3¾” 51³/”
(x2) (x2) L=~256″
(x2)
B1
(x4)
G

·

63″

·

78″ x 1″ 59¹/” ·

70″

·

86″

x

4²³/” x 1″ 59¹/” · 70″

·

86″ x 1″ 59¹/” ·

70″

·

86″ x 1¾” 59¹/” ·

x 1″ 70″ · 86″
59¹/”

x ·

17″0x “15·9¹8″/6” “·x710³/”59·”¹/8×61″·””x703/4″”·x816″”

x 3/8″ x 1″ 51³/” · 63″

·

78¾”

x

20¹¹/”

(x1)

(x1)

(x2) (x1)

(x1) (x1)

B

Y

W Z

3¹/1″ x51b(” x12″)

X

x2 drain set

20

25¹/ x
(x2)

3¹1/5″ x a1″
(x2)

15c

27/x 1″ x 1″ 32¹¹/ x 3¹/”

x

15d
1″

(x1)

59¹/” · 70″ · 86″ x 2″

x

2″

22

(x2)
10a

18½”

x

1¾”

x 1¾”
10c

(x2)

5″ x 1¾” x 1¾”

(x2)

O

N

x 3¹/” 50″ · 61¹³/” (x2)

·

77/” H

x

15³/” M

11
x 3/”
D

C

” x 1¼ ” x 1½” ³/” x 2″ /” x 2¼” ³/” x 3½” L=~9″

(x1)

20d (x2)

20b (x2)

(x2) 25

(x38/50/62) (x5/7/8)

I J K L

(x4)
E

F
(x3)

(x1)

20c (x2)

20a (x2)

L=~17³/
(x16)

Bit PH2

Torx bits

T10 T15 T20 T25

~2lbs. (x15) (x90) (x45) (x150) (x50)

(x4) (x2)

Tools needed

Measuring tape Marker pen Circular saw

Water level

Hammer

Ratchet strap

Extra hands
Silicone gun (Only glass-wall models)

Drill

Cresent wrench

Utility knife Rubber mallet

Wooden front wall installation

Details S

S1

U

x4

T

76″ x 3¾” x 1″

TL1

x1

x1

x2

x1

16x J

S
T
I

T S1

DET U Fix it diagonally to make wall more rigid during the installation.

Brackets inside Vent

2x I
III
Proceed with main installation manual!
II

Half-moon wall installation

Details

U X

Silicone 76″

x

3¾”

x

1″

78¾”x1¹¹/”x¹¹/”

TL1

Place details on flat, level surface!

x1

x1

Cut and remove

I

straps

DET U 2x I

39″

II 1x I

III
1.

Apply waterproof silicone into the groove

2x M

IV

Pre-drill screw

holes ”

WARNING: Do not let screws touch glass!

Half-moon wall installation
Brackets inside

Check also main installation manual.

Remove before last boards

I
Apply waterproof silicone.
III
2.

II

Cut on right size
X

6x J

IV

E6W Barrel Sauna 59D” x 81H”

4x M

DET 1

2xDET A
DET 1
1.

51³/” · 63″ · 78¾”

Diagonal measurements should be equal 63″
4x M

E6W Barrel Sauna 59D” x 81H”

8x DET 3

Center stave 2 on cradle 1
Position cradles inside
grooves of stave 2

W

II

Y

Z X

2x M

mm=mm

DET 2

I

2.

3

2 33a

E6W Barrel Sauna 59D” x 81H”
I
16x M
II
3.

E6W Barrel Sauna 59D” x 81H”

Drill 4 holes Ø1/2″ through DET 2 outside

6x H
3xDET 3
Fix temporarily to support walls.
Use waterlevel
II
4.

90°
I
Check walls installation manual on extra pages! Sauna wall configuration depends on Your model! Brackets inside
~1/4″
IMPORTANT! Be sure to leave a 1/4″gap when tightening screws to
leave room for adjustment when the outer bands (B) are installed.

4x H

E6W Barrel Sauna 59D” x 81H” Remove
temporary bracing
H

DET 3

I

~1/4

Important! Leave space

H

IMPORTANT! Be sure to leave a 1/4″

gap when tightening screws to leave

room for adjustment when the outer

bands (B) are installed.

Strap
Use strap to support boards during installation

See the next page. DET 3

III

5.

II

E6W Barrel Sauna 59D” x 81H”

6 6a 6b 6c 6d

3
A I

3
Join two boards together (as shown in diagram II) that will bridge the width of the “A” gap. It is recommended that the combined boards are approximately 1/4″ wider than the gap.
Raise slightly before installing the combined board

DET 6
If needed, trim the flat edge of the board to create the desired width.

4
Fasten the two halves using screws
II
6.

III

E6W Barrel Sauna 59D” x 81H”
DET B1

~9/”

~5″

I
2x DET B

DET B

II 7.

Place the bands around the barrel on the outer
side of the cradle.
III

DET B1

Remove strap

DET B

E D
C

E6W Barrel Sauna 59D” x 81H”
Remove all
temporary braces

1x DET G

6x K

Pre-drill holes Ø5/32″ before screws.

I
2x DET 10a
2x H

Upper vent

3x DET F

Lower vent

6x K

72″ and 88″ Saunas with front-glass wall have 4 pc. of DET 10a.

8.

II

2x DET 10

NB! If Your sauna equipped with front-glass wall, see front-glass wall installation manual for proper benches installation.

III

E6W Barrel Sauna 59D” x 81H”

Pre-drill holes 1/8″

10x I

10x I
I
72″ & 88″ Saunas with front-glass walls have four pieces of 10c.

Use level for installation of benches
2x DET 11

2x H

Under the benches

9. II

4x H
2x DET 10c

6x M
III

E6W Barrel Sauna 59D” x 81H”
2x J
2x DET 15a

2x H

2x DET 15b

If needed – To accommodate

the size of your heater, trim

15A on the end that meets

the back wall, before adding

part H

I

2x DET 15c

Mount sauna heater before installing safety rail, per manufacturer’s recommended safety clearance

1x DET 15d

10.

II

6x I 2x J

Use waterlevel! Fasten door from inside.
~39″

E6W Barrel Sauna 59D” x 81H”
2x M

X= Front wall thickness Wooden front wall 1″ Glass front wall 1″

X
1x DET 20 2x DET 20c 2x DET 20d

I
2x DET 20a 2x DET 20b

X

2x M

Ensure door frame is pressed

II

tightly against the wall and

fasten from inside

18x H

16x J
11. III

8x H

2x DET 22
IV

8x H

E6W Barrel Sauna 59D” x 81H”
See the installation manual inside the shingles package

DET N

Overlap shingles on top
DET O Cut off
12. II

I
L

~”
Check also roof shingles installation manual inside package.

Cut DET N into three equal segments

Cut and use other end.

DET N

III

E6W Barrel Sauna 59D” x 81H”
8xDET 25

8xDET 25

16x H
I

16x H

13.

II

Remove DET A

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.