G4 Garden Series Outdoor Sauna
Product Information – Garden Series Model G4 Outdoor Sauna
The Garden Series Model G4 Outdoor Sauna is a sauna designed for
outdoor installation. It comes with a ground frame, floor beams,
purlins, roof boards, frontboard, gableboard, and ventilation
grill. The sauna is made of wall planks that need to be installed
using screws. The product is designed to be assembled with the help
of tools such as a hammer, hammer block, water level, and measuring
tape. The product dimensions are not mentioned in the manual
extract.
Product Usage Instructions
- Read the entire manual before starting the assembly
process. - Get all the necessary tools required for the assembly
process. - Fasten the base frame with screws and make sure it is attached
to the foundation. - Ensure that the diagonals are of the same length and drill
holes before inserting screws. - Place the wall planks above the base frame and ensure that they
are 10mm above the edge of the base frame. Fix the first row of
wall plank with screws to the base frame using a hammer and hammer
block. - Continue installing new wall details using a hammer and hammer
block. Make sure that the positions are installed completely. - Install purlins using screws and adjust the tapping if
necessary. Fasten the gable parts with screws. - Install the ventilation grill in the back wall and fasten the
roof boards with screws while starting with the groove edge on the
board. - Cut the last roof board to the correct width and align its edge
with the wall plank and purlins. - Cut correct lengths and fasten frontboards fixing with
screws.
Read the entire manual before assembly. Get the tools you need.
Garden Series Model G4 Outdoor Sauna
April 2023
Pas
001
85
1017
[]I
002
208 85
DO
003
85
1017
[]I
004
208 85
DO
005
300
c::Jj
2000
006
=3=00rr::::
2000 LI
007
……..
008
1000
500
009
466 500
—==-c:
010
85
[]
2000
011
85
[]
2000
012
85 208
oc::J
013
85 208 DC]
014
85
Oc::i
015
200
D D
016
2000 2000
2000
017
85
2000
[] QGR1
FB1
FB3
FB2
FB4
=
u PR1
200
D
2000
WINDOW 765×1900
Drawing Model G4 Outdoor Sauna
85
ID
85
ID
85
ID
85
ID
85
LJO
200
0
85
ID
GROUNDFRAME FLOORBEAMS FLOORBEAMS FLOORBEAMS FLOORBEAMS 200 Purlins
[LJ
DOOR 800×1900 Garden Series Model G4 Outdoor Sauna
Q ianti
y
Profil (mm)
Lenght (mm)
1 45×130 1147
1 45×130 338
14 45×130 1147
14 45×130 338
2 45×130 2475
2 45×130 2475
2 45×58 459
2 45×130 1545
2 45×129 1011
1 45×130 2260
30 45×130 2260
2 45×65 338
28 45×130 338
1 45×130 2260
2 45×130 2490
1 45×65 2260
1 45×130 2260
2 90×45 2380
2 45×45 2070
3 45×45 1990
1 45×45 1890
3 45×45 345
1 70×170 2490
2
1 1/1
Model G4 Outdoor Sauna 45×130 mm
POS ST. B H L
FB/GF According to Spec
F1 4m 2 28
1995
F2 0.84m 2 28
2090
PR1 1 70 170 2490
RB1 7,3m2 20
2913
D LAGERHOLZ
c::==::J TERRACE FLOOR BOARDS
c::==::J TERRACE FLOOR BOARDS
D PURLINS I II
ROOF BOARDS ( 1341 mm + 1572 mm )
R1
2 20 140 2530 c::==::J FRONTBOARD
I
R2
4 20 140 1550 c::==::J GABLEBOARD
/
R3
2 45 45 2490 FRONTBOARD FIXING
SK 2 45 65
@ HAMMER BLOCK
P2
P3
II I
I
I
DR1 1 800 1900 WN1 1 765 1900 WN2 1 765 1900
P2 I P2 ,.
P2
P2 I
P2
P1 9m 20 40
c::::::: FLOOR STRIPS
P2 6+6 20 90 1880 c::==::J INT, EXT SLATS DR1, WN1, WN2
P3 1+1 20 90 1065 c::==::J INT, EXT SLATS WN2
1+1
«1111111111111111111111
t
t
Groundframe
B B VENTILATION COVER
20
-=-I 4×50
Groundframe
120
—–=-I Sx100 4×50 4×50 4×50 4×50
First row of wall logs Floorboards Floor edge trims Roofboards Frontboard, Gableboard, Frontboard fixing
12 130 15 95 50
–=-I
Sx100 4×50
Purlins Window and door slats
2 80
Fasten the base frame with screws. If possible, fasten the base frame to the
Foundation
Diagonals must be of the same lengths.
Drill holes before screws.
1 Groundframe
Use waterlevel and measuring tape
The wall plank must be 10 mm above the edge of the base frame.
The first wall plank row must be fixed with screws to the base frame.
2 First wall row
Use hammer and hammer block.
3 Installing walls
Use hammer and hammer block.
Install the positions below comletely.
4 Installing walls
Continue with new wall
details.
Use hammer and hammer block.
Step 1
Step 2
Step 3
5 Installing walls / Purlins
Use hammer and hammer block.
Step 1 Step 2
6 Purlins
Fasten the purlins with screws.
Make sure the upper side of the
purlins is oblate. If necessary, adjust
the tapping of the purlins.
Fasten the gable parts with screws.
Install the ventilation grill in the back wall.
Step 1
Step 2
Fasten the roof boards with screws. Start
with the groove edge on the board.
7 Ventilation grill/Roof boards
Complete the installation of parts RB1
Step 1
Step 2
Cut the last roof board to the correct width.
The edge must be aligned with the wall plank
and the purlins.
8 Roof boards
Cut correct lengths and fasten frontboards fixing with
screws.
9 Roof boards
Install roof shingles, use small nails.
Step 1
Step 2
Fasten the frontboard with screws. Cut the correct angle and fasten gableboards with screws.
10 Roof cover / Covering strips
Fasten the floor / terrace boards with screws. Cut the final floor/ terrace board to the correct
width.
Cut the floor stripes on right angle and size, then install
with screws.
11 Floor / Terrace boards / Floor stripes
Slats can only be screwed to the door and window frame and not to
the wall.
12 Door / Window
P2
P2 P2
P3
P2
P2
P2
P2
P3
P2
P2
P2
P2
P2
To fix the door and windows to the house use only slats.
Slats can only be screwed to the door and window frame and not to the wall.
Left / Right
Up / Down
In / Out
Adjust the door.
13 Door / Window
Element 1
X 1 Element 3
X 2
Element 2 X 1
Det 1 X 3
Det 2 X 2
Det 3 X 2
Det 4 X 1
Det 5 X 2
2sc5rmemws
53 Element 3
Det 107 1
Det 2
Det 3
Det 5
550
42 0
NB Drill the pilot holes for the screws
70mm screws
7sc0rmemws
7sc0rmemws
Det 4
40mm screws
Connect element 3 to the wall












