315547 Pisces Queen Platform Bed
Product Information: B1564-300 PISCES 5/0 Q PANEL
BED-HB/FB/RAILS
Thank you for purchasing this quality product. Be sure to check
all packing materials carefully for small parts, which may have
come loose inside the carton during shipment. Identify and count
all items and compare with the parts list and/or hardware list
shown.
Parts List
| No | ITEM | Qty |
|---|---|---|
| A | Headboard | 1 pc |
| B | Footboard | 1 pc |
| C | Headboard Leg LSF | 1 pc |
| D | Headboard Leg RSF | 1 pc |
| E | Bed Roll-Out Slats | 2 sets |
| F | Bed Slats Support | 4 pcs |
| G | Side Rail Left | 2 pcs |
| H | Side Rail Right | 2 pcs |
| I | Center Slat | 1 pc |
| J | Side Rail Leg | 2 pcs |
Hardware List
| No | ITEM | Qty |
|---|---|---|
| 1 | JCBC M6 x 30mm | 12 pcs |
| 2 | JCBC M6 x 50mm | 4 pcs |
| 3 | Flat Washer 1/4ID x 19mmOD Blk | 12 pcs |
| 4 | ALLEN KEY m4x65mm Blk (FOR HB LEG) | 1 pc |
| 5 | ALLEN KEY m5x65mm Blk (FOR SIDE RAIL) | 1 pc |
| 6 | Flat Head Chipboard Screw m4x32mm Rbw | 32 pcs |
Product Usage Instructions
Step 1.1: Attach Head Board Leg (C, D) to Head
Board (A) using Flat washer (3) and securing with ALLEN KEY
(4).
Step 1.2: Fix the other holes with Csk Screw
(6) as shown.

Note: Must tighten screws periodically with
use, screws will become loose. Check tightness of all screws every
6-8 weeks.
Step 2.1: Attach Side Rail (G) & (H) to the
Side Rail Leg (J) using JCBC BOLT (1) with Flat washer (3) and
securing with ALLEN KEY (4) by outside side rail (G) & (H).
Step 2.2: Loosen JCBB Bolt at Headboard &
Footboard Leg using Allen Key (5) (Do not tighten them before Hook
Set-up side rail to Head Board (A) closely and push down to fit and
tighten them accordingly. Repeat step 2.2 with other end of rail to
hook onto FOOTBOARD (B).

Note: Do not fully tighten screw in this step
before align the side rail as shown. Must tighten screws
periodically with use, screws will become loose. Check tightness of
all screws every 6-8 weeks.
Step 3: Fix the Bed Slat Support (F), to Bed
Slat (E) and Center slats (I) tighten with JCBC Bolt (2) as shown.
Install the bed slat (E) to side rail (G) & (H) and tighten
with Csk Screw (6) as per diagram shown. (Note: The setup must be
done at the decided location for the bed to obtain perfect
stability) Repeat step 3 for other set of slats assembly.

Step 3.1: Push the side rail(G)&(H) meet
with wooden slat(E) and fix the CSK Screw(6) by using the Screw
Driver.
Step 3.2: Push Slat (E) to the end of side rail
and secure with CSK Screw(6) as shown.
Note: Must tighten screws periodically with
use, screws will become loose. Check tightness of all screws every
6-8 weeks.
ASSEMBLY INSTRUCTIONS
B1564-300 PISCES 5/0 Q PANEL BED-HB/FB/RAILS
Thank you for purchasing this quality product. Be sure to check all packing materials carefully for small parts,
which may have come loose inside the carton during shipment. Identify and count all items and compare with
the parts list and/or hardware list shown.
PARTS LIST
HARDWARE LIST
No
ITEM
Qty
No ITEM
Qty
A Headboard B Footboard C Headboard Leg LSF D Headboard Leg RSF E Bed Roll-Out Slats F Bed Slats Support G Side Rail Left
1 pc 1 pc 1 pc 1 pc 2 sets 4 pcs 2 pcs
1 JCBC M6 x 30mm 12 pcs
2 JCBC M6 x 50mm 4 pcs
Flat Washer 1/4″ID x
3
19mmOD Blk
12 pcs
ALLEN KEY
m4x65mm Blk
4
(FOR HB LEG)
1 pc
H Side Rail Right I Center Slat J Side Rail Leg
2 pcs 1 pc 2 pcs
ALLEN KEY
m5x65mm Blk
5 (FOR SIDE RAIL)
1 pc
Flat Head Chipboard
6 Screw m4x32mm Rbw 32 pcs
STEP 1.1 : Attach Head Board Leg ( C,D ) to Head Board ( A ) as shown using Flat washer (3)and securing with ALLEN KEY ( 4 ) .
STEP 1.2 : Fix the other holes with Csk Screw (6) as shown.
JCBC BOLT( 1 ) with
A
C
4
1 LEFT
RIGHT
D
BACK VIEW
C
C
3
4x
STEP 1.1 :
STEP 1.2 :
6
8x
1 OF 2 NOTE : MUST TIGHTEN SCREWS PERIODCALLY WITH USE SCREW WILL BECOME LOOSE CHECK TIGHTNESS OF ALL SCREW EVERY 6-8 WEEKS.
STEP 2.1 : Attach Side Rail ( G ) & ( H ) to the Side Rail Leg ( J ) as shown using JCBC BOLT( 1 )with Flat washer (3)and securing with ALLEN KEY ( 4 ) by outside side rail (G) & (H) .
STEP 2.2 : Loosen JCBB Bolt at Headboard & Footboard Leg using Allen Key (5) (Do not tighten them before Hook SET-UPSIDE RAIL TO HEAD BOARD (A) closely and push down to fit and tighten them accordingly. Repeat step 2.2 with other end of rail to hook onto FOOTBOARD (B).
4
STEP 2.2 :
x8
1
STEP 2.1 : G
3 J
LOOSEN 5
H
TIGHTEN 5
A
Left Sticker
HJ
G
Right Sticker
L
ALIGN BEFORE TIGHTEN
R
J
GH
FRONT VIEW J
SIDE VIEW
DO NOT FULLY TIGHTEN SCREW IN THIS STEP BEFORE ALIGN THE SIDE RAIL AS SHOWN.
H
B
G
STEP 3 : Fix the Bed Slat Support (F ), to Bed Slat (E) and Center slats (I) tighten with JCBC Bolt (2) as shown . Install the bed slat ( E ) to side rail ( G ) & ( H ) and tighten with Csk Screw ( 6 ) as per diagram shown. (NOTE: THE SETUP MUST DONE AT THE DECIDED LOCATION FOR THE BED TO OBTAIN PERFECT STABILITY) Repeat step 3 for other set of slats assembly.
I E
E
STEP 3.4 : I
B
F
6 H
STEP 3.5 :
4 2
STEP 3.1 :
Push the side rail(G)&(H) meet with wooden slat(E) and fix the CSK Screw(6) by using the Screw Driver.
STEP 3.2 : 6 G
E
REMARK: Push Slat (E) to the end of side rail and secure with CSK Screw(6) as shown.
STEP 3.3 : F
Leveler
2 OF 2
NOTE : MUST TIGHTEN SCREWS PERIODCALLY WITH USE SCREW WILL BECOME LOOSE CHECK TIGHTNESS OF ALL SCREW EVERY 6-8 WEEKS.










