Project Source Vinyl Flush Mount Stair Nose Moisture Proof Moulding Instruction Manual

Vinyl Flush Mount Stair Nose Moisture Proof Moulding

Vinyl Stair Nose Moulding

Product Information:

Product NameVinyl Stair Nose Moulding
Installation Instructions1. Measure and trim to fit.
2. Apply polyurethane adhesive to the underside.
3. Carefully position the trim and press down firmly along the
entire stair nose.
4. Let adhesive cure for at least 4 hours before walking on
it.

Product Usage Instructions:

To install the Vinyl Stair Nose Moulding, please follow these
steps:

  1. Measure and trim the moulding to fit your staircase.
  2. Apply polyurethane adhesive to the underside of the
    moulding.
  3. Carefully position the moulding on the stair nose, ensuring it
    is aligned properly.
  4. Press down firmly along the entire length of the moulding to
    secure it in place.
  5. Allow the adhesive to cure for at least 4 hours before walking
    on the stairs.

Note: Depending on your specific installation requirements, you
may need to use a shim or overlap the moulding with the flooring.
Please refer to the provided illustrations in the user manual for
further guidance.

Vinyl Stair Nose Moulding Installation Instructions
The Project Source Vinyl flush mount stair nose is a moisture proof moulding that is suitable to finish step downs and stair installations. The Project Source Vinyl flush mount stair nose is designed for versatility and beauty. One moulding can accommodate a wide range of floor thicknesses, from 2mm up to 7.5mm in thickness. The width of the stair nose provides a more polished finished stair tread than other products. The longer length will accommodate more stairs and can be used on bull-nosed and squared-nosed stair installations. Just follow these simple steps.
78-3/4 in · 2m

Step 1: Measure and trim to fit.
· For flush installation, install matching shim to the edge of the stair tread. · A shim is not required for overlap installation.

Flush mount with shim

Flooring

Overlap without shim

Shim

Flooring

6/2023

Vinyl Stair Nose Moulding Installation Instructions | 1

Vinyl Stair Nose Moulding Installation Instructions
Step 2: Apply polyurethane adhesive to underside.
· “S” shaped bead on ribbed surface of nosing. · Straight bead under stand-off elbow.

Step 3: Carefully position the trim and press down firmly along the entire stair nose.

Flush mount with shim

Overlap without shim

Step 4: Let adhesive cure for at least 4 hours before walking on it.
· Wait 24­48 hours for full traffic exposure.

6/2023

Vinyl Stair Nose Moulding Installation Instructions | 2

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals