
Tools Needed:
Herramientas necesarias:

Preparation:
Install when the temperature is: between 40°- 90°F (5°- 32°C)
Installation:
- Make sure the door surface is clean, dry, and grease-free.
- Measure door width.
- Shorten sweep if needed.
- Place the product so the sweep flexes against the threshold.
- Remove the backing paper and press sweep into place.
Toledo & Co.,Inc.
www.toledolocks.com

Be responsible.
Dispose of properly.
Made in China by strict specifications from Toledo & Co., LLC USA

















