VENTS MV 150 Plastic Ceiling/Wall Grille in White for 6 in. Duct Opening

INSTALLATION
TOOLS REQUIRED
- Pencil

- Drill

- Hammer

- Screwdriver

- Dowel 4 pcs

- Screws 4 pcs

- DISASSEMBLE THE HOOD

- MARK FASTENING HOLES USING THE FRAME

- DRILL HOLES ON THE MOUNTING SURFACE ACCORDING TO THE MARKING

- INSERT THE DOWELS IN THE HOLES.

- FIX THE FRAME ON THE MOUNTING SURFACE WITH SCREWS.

- INSTALL THE FILTER AND FIX THE HOOD ON THE FRAME USING THE LATCHES.




























