FORSTER TECHNIK TAP5-EZ2-32 Automatic Lamb Feeder User Guide


5.1 Installation checklist
This document provides a brief overview of what to consider when installing a lamb feeder.
- Establish ground connection

- Connect power
- Connect water

- Open hose fittings

- Feeding station – suction hose

- Fix protection grid and fill the powder hopper

- Fill boiler

- New setup

All values set back to factory settings. Boiler is filled. - Adjust target temperature


- Adjust portion size – Water

Adjust portion size – Milk powder (MP)
- Cleaning – Mixer

- Cleaning – Suction hose

This checklist refers to the basic equipment of the Lamb Feeder. Not all available functions can be shown.
For detailed information and valid warnings as well as safety instructions, please refer to the instructions manual. (Status 21/07)