Forster Technik Tap5-ez2-32 Automatic Lamb Feeder System User Guide

Forster Technik Tap5-ez2-32 Automatic Lamb Feeder System User Guide

FORSTER TECHNIK TAP5-EZ2-32 Automatic Lamb Feeder System

Installation checklist

This document provides a brief overview of what to consider when installing a lamb feeder.

  1. Establish ground connection
  2. Connect power
  3. Connect water

  4. Open hose fittings
  5. Feeding station – suction hose

    Mount the suction hose holder for cleaning – higher than the mixer position and near the suction points.
  6. Fix protection grid and fill the powder hopper

  7. Fill boiler

  8. New setup

    All values set back to factory settings. Boiler is filled.
  9. Adjust target temperature

    Hint: button
    * press to stop Automatic mode
    ** press to start Automatic mode
  10. Adjust portion size – Water

    10. Adjust portion size – Milk powder (MP)
  11. Cleaning – Mixer
  12. Cleaning – Suction hose

This checklist refers to the basic equipment of the Lamb Feeder. Not all available functions can be shown.
For detailed information and valid warnings as well as safety instructions, please refer to the instructions manual. (Status 21/07)

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals