Dosatron D40mz3000bpvfhy Injection Seal Kit Instructions

D40MZ3000BPVFHY Injection Seal Kit

Product Information: Part PJDI216: D40MZ3000 – 40 GPM Injection
Seal Kit

The Part PJDI216: D40MZ3000 – 40 GPM Injection Seal Kit contains
the following items:

  • (1) PJDI215 Check valve assembly
  • (1) JDI100 Injection sleeve o-ring
  • (1) JDI200 Plunger seal
  • (1) 20J006 Upper injection stem insert o-ring
  • (1) JDI120 Injection stem o-ring

The product is recommended to be cleaned with warm soapy water
and a toothbrush before installing the new parts. Water normally
lubricates the parts, but you may use silicone on the o-rings to
facilitate insertion. The parts may contain STOP concentrated
chemicals, so the use of proper protective equipment is recommended
when performing maintenance.

Product Usage Instructions:

  1. Unscrew hose nut (P150) and remove the hose. Unscrew injection
    stem assembly nut (PDI702) and pull down on the stem to detach it
    from the body of the unit.
  2. Unscrew check valve nut (8P168) and pull out check valve
    assembly (PJDI215). Be sure to remove the barb and check valve and
    discard.
  3. Unscrew locking nut (8P197U), remove C clamp (PDI727) by
    slightly spreading the opening and gently sliding it down over the
    threads. Unscrew adjusting nut (PPDI068). Holding the sleeve
    (PDI1245), push up on the threaded part of the white injection stem
    (PDI1241U) and slide it out of the sleeve from the top. Replace the
    injection sleeve o-ring (JDI100).
  4. From the injection stem (PDI1241U), unscrew the upper insert
    (PDI1240U). Flip the stem (PDI1241U) upside down so the upper
    insert o-ring (20J006) comes off, discard and replace. Remove and
    replace the injection stem o-ring (JDI120) as well. Screw the upper
    insert back on.
  5. Slide the injection stem (PDI1241U) down into the sleeve
    (PDI1245), making sure the small key inside the sleeve is aligned
    with the longest groove on the white stem. Holding the graduated
    sleeve, pull down on the white stem as far as it will go. Thread
    the adjusting nut (PPDI068) back onto the sleeve (PDI1245).
    Reinstall C clamp (PDI727) by gently sliding it over the threads at
    the bottom of the white stem. Rotate clamp until it clicks into
    place. Screw locking nut (8P197U) back on. To remove o-ring easily
    without tools, squeeze it on either side to raise the seal, then
    slide it over the groove.
  6. Insert the new check valve (PJDI215) at the bottom of the white
    stem, making sure that the 4 white keys on the check valve seat
    next to the 4 keys on the bottom of the stem. Screw check valve nut
    (8P168) back on.
  7. Set the stem aside and pick up the blue body. Remove and
    replace the plunger seal (JDI200), by pinching it and rolling out
    of the plunger or using a small flat blade screwdriver. Be careful
    not to damage the tip of the plunger.
  8. Carefully push the complete injection stem assembly in position
    at the bottom of the blue body, making sure desired scale is facing
    front of injector. Use a vertical motion to avoid bending the
    plunger. Keys at the top of the graduated sleeve should slide into
    the slots at the bottom of the body. Slide injection stem assembly
    nut (PDI702) up the sleeve and screw back on. Insert hose back onto
    the bottom of the check valve barb and screw hose nut (P150) back
    on.

Part PJDI216: D40MZ3000 – 40 GPM
Injection Seal Kit

This kit contains:

(1) PJDI215 Check valve assembly

(1) JDI100

Injection sleeve o-ring

(1) JDI200 Plunger seal

(1) 20J006

Upper injection stem insert o-ring

(1) JDI120 Injection stem o-ring

Vea el reverso para Español.

2090 Sunnydale Blvd. Clearwater, FL 33765 1-800-523-8499 · 1-727-443-5404 www.dosatronusa.com

Kit Contents:

PJDI215: Check valve assembly

JDI100: Injection sleeve o-ring

JDI200: Plunger seal
20J006: Upper injection stem insert o-ring

JDI120: Injection stem o-ring

We recommend cleaning all parts with warm soapy water and a toothbrush before installing the new parts.
Water normally lubricates the parts, but you may use silicone on the o-rings to facilitate insertion.

CAUTION: Parts may contain STOP concentrated chemicals. The use of
Proper Protective Equipment is recom-
mended when performing maintenance.

Instructions
(Parts included in kit noted in blue)
1. Unscrew hose nut (P150) and remove hose. Unscrew injection stem assembly nut (PDI702) and pull down on stem to detach from body of unit.

PDI702 P150

2. Unscrew check valve nut (8P168) and pull out check valve assembly (PJDI215). It may come out in one or two pieces. Be sure to remove the barb and check valve and discard.

PJDI215 8P168

3. Unscrew locking nut (8P197U), remove “C” clamp (PDI727) by slightly spreading the opening and gently sliding it down over the threads. Unscrew adjusting nut (PPDI068). Holding the sleeve (PDI1245), push up on the threaded part of the white injection stem (PDI1241U) and slide it out of the sleeve from the top. Replace the injection sleeve o-ring (JDI100).

PDI1241U
JDI100 PDI1245
PPDI068 PDI727 8P197U

4. From the injection stem (PDI1241U),

unscrew the upper insert (PDI1240U).

Flip the stem (PDI1241U)

upside down so the upper insert o-ring

PDI1240U

(20J006) comes off,

20J006

discard and replace.

JDI120

Remove and replace the

injection stem o-ring

PDI1241U

(JDI120) as well. Screw

the upper insert back on.

5. Slide the injection stem (PDI1241U) down into the sleeve (PDI1245), making sure the small key inside the sleeve is aligned with the longest groove on the white stem. Holding the graduated sleeve, pull down on the white stem as far as it will go. Thread the adjusting nut (PPDI068) back onto the sleeve (PDI1245).
(continued)

5. (continued)
Reinstall “C” clamp (PDI727) by gently sliding it over the threads at the bottom of the white stem. Rotate clamp until it clicks into place. Screw locking nut (8P197U) back on.
To remove o-ring easily without tools, squeeze it on either side to raise the seal, then slide it over the groove.

PDI1241U
JDI100 PDI1245
PPDI068 PDI727 8P197U

6. Insert the new check valve (PJDI215)

at the bottom of the white stem,

making sure that the 4 white keys on

the check

valve seat next

to the 4 keys on

the bottom of

the stem.

Screw check

valve nut

(8P168) back on.

PJDI215 8P168

7. Set the stem aside and pick up the blue body. Remove and replace the plunger seal (JDI200), by pinching it and rolling out of the plunger or using a small flat blade screwdriver. Be careful not to damage the tip of the plunger.

JDI200

8. Carefully push the complete injection stem assembly in position at the bottom of the blue body, making sure desired scale is facing front of injector. Use a vertical motion to avoid bending the plunger. Keys at the top of the graduated sleeve should slide into the slots at the bottom of the body. Slide injection stem assembly nut (PDI702) up the sleeve and screw back on. Insert hose back onto the bottom of the check valve barb and screw hose nut (P150) back on.
To ensure hose is air-tight, you may choose to carefully cut the top of hose before reinserting.

Contenido del Kit:

PJDI215: Válvula cheque

JDI100: O-Ring de la manga de inyección

JDI200: Sello de émbolo

20J006: o-ring del tapón de la barra de inyección.

JDI120: O-Ring de la barra de inyección

Recomendamos limpiar todas las partes con agua tibia jabonosa y un cepillo de dientes, antes de instalar las partes nuevas. El agua normalmente lubrica las partes, pero usted puede usar silicón en los anillos para facilitar la inserción.
PRECAUCIÓN: Las partes pueden
STOP
contener químicos concentrados. El uso de Equipo de Protección Adecuado es recomendado cuando se efectúa el mantenimiento.

3. Desatornille la tuerca de seguridad (8P197U), y remueva el anillo en forma de “C” (PDI727). Desatornille la tuerca de ajuste (PPDI068). Sujete la manga (PDI1245) y empuje hacia arriba la barra blanca de inyección (PDI1241U) y sáquela completamente de la manga. Remplace el anillo de la manga de inyección (JDI100).

PDI1241U
JDI100 PDI1245
PPDI068 PDI727 8P197U

4. De la barra de inyección

(PDI1241U), desatornille el inserte superior

PDI1240U

(PDI1240U). Invierta la

20J006

barra (PDI1241U) para

JDI120

que salga el o-ring del inserte superior

PDI1241U

(20J006), reemplácelo

con el nuevo. También

remueva y reemplace el

o-ring de la barra de inyección (JDI120).

Vuelva a atornillar el inserte.

6. Inserte la nueva válvula cheque

(PJDI215) en la parte inferior de la

barra blanca, asegurándose que las

4 marcas en la

válvula cheque

coincidan con las

4 marcas en la

parte inferior de

la barra. Atornille

de nuevo la tuerca

de la válvula cheque (8P168).

PJDI215 8P168

7. Coloque el vástago a un lado, y sujete el cuerpo azul. Remueva el Empaque/Sello del Émbolo apretándolo y deslizándolo fuera del émbolo. Instale el nuevo empaque/ sello del émbolo (JDI200) en la ranura del émbolo.

Instrucciones
(Partes en color azul incluidas en el kit)
1. Desatornille la tuerca de la manguera (P150). Desatornille la tuerca del montaje de inyección (PDI702) y jale el montaje hasta separarlo de la unidad.
PDI702
P150
2. Desatornille la tuerca de la válvula cheque (8P168) y remueva la válvula cheque (PJDI215). Puede salir en una o dos piezas. Asegúrese de sacar desechar ambas partes.
PJDI215 8P168

5. Inserte la barra de inyección (PDI1241U) por la parte superior de la manga (PDI1245), la marca dentro de la manga debe estar alineada con la ranura larga en la barra blanca. Empuje la barra dentro de la manga hasta el fondo. Atornille la tuerca de ajuste (PPDI068) a la manga (PDI1245). Reinstale el anillo en forma de “C” (PDI727). Gírelo hasta que encaje en posición. Atornille la PDI1241U tuerca de seguridad (8P197U).

JDI100

PDI1245
PPDI068 PDI727 8P197U

Para remover fácilmente el anillo sin uso de herramientas, solo oprímalo en ambos lados y este levantara una parte para ser extraído.

JDI200
8. Sujete el montaje de inyección a la unidad, empújelo completamente hasta que esté en posición. Asegúrese que la escala deseada se encuentre en la parte frontal del inyector. Las marcas en la parte superior de la manga negra deben encajar en los espacios en la parte inferior del cuerpo de la unidad. Atornille la tuerca (PDI702). Inserte la manguera en la parte inferior al final de la lengüeta y atornille la tuerca de la manguera (P150).
Para asegurarse que haya una succión adecuada, usted puede cortar con cuidado la punta de la manguera en línea recta.

References

    Documents / Resouces

    Download manual
    Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


    Related Manuals