Growatt Axe 5.0l Modular Battery Installation Guide

Growatt Axe 5.0l Modular Battery Installation Guide

Growatt-AXE-5-0L-Modular-Battery-FIG-LGOO

Growatt AXE 5.0L Modular Battery

Growatt-AXE-5-0L-Modular-Battery-FIG-PRODUCT

Installation environmentGrowatt-AXE-5-0L-Modular-Battery-FIG-1
Installation toolsGrowatt-AXE-5-0L-Modular-Battery-FIG-2
Battery sizeGrowatt-AXE-5-0L-Modular-Battery-FIG-3
CheckGrowatt-AXE-5-0L-Modular-Battery-FIG-4Growatt-AXE-5-0L-Modular-Battery-FIG-5
Battery operation panel introductionGrowatt-AXE-5-0L-Modular-Battery-FIG-6
Floor installation with baseGrowatt-AXE-5-0L-Modular-Battery-FIG-7

Installation Location Requirements
Note:

  1. The battery base is required while installing the battery system .
  2.  The maximum quantity of stacking battery pack is 10, if it exceeds 10, please install them by the way of multiple clusters in parallel.
  3.  Please install indoors and ensure the level of the ground.

 Installation ProcedureGrowatt-AXE-5-0L-Modular-Battery-FIG-8

WiringGrowatt-AXE-5-0L-Modular-Battery-FIG-10

Note: 1) Please install the communication line first, then plug the unused RJ45 port and USB port with a dust cover, and finally install the power line.
2) No cable connection required between battery packs in a single battery cluster.

Key operationGrowatt-AXE-5-0L-Modular-Battery-FIG-11

Power button

Service and contact

Shenzhen Growatt New Energy CO.,Ltd 4-13/F,Building A,Sino-German,Europe,Industrial Park, Hangcheng Ave,Guxing Community,Xixiang Subdistrict, Bao’an District,shenzhen,China. W:www.ginverter.com [email protected]Growatt-AXE-5-0L-Modular-Battery-FIG-12

References

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals