Growatt AXE 5.0L Modular Battery

Installation environment
Installation tools
Battery size
Check

Battery operation panel introduction
Floor installation with base
Installation Location Requirements
Note:
- The battery base is required while installing the battery system .
- The maximum quantity of stacking battery pack is 10, if it exceeds 10, please install them by the way of multiple clusters in parallel.
- Please install indoors and ensure the level of the ground.
Installation Procedure
Wiring
Note: 1) Please install the communication line first, then plug the unused RJ45 port and USB port with a dust cover, and finally install the power line.
2) No cable connection required between battery packs in a single battery cluster.
Key operation
Power button
Service and contact
Shenzhen Growatt New Energy CO.,Ltd 4-13/F,Building A,Sino-German,Europe,Industrial Park, Hangcheng Ave,Guxing Community,Xixiang Subdistrict, Bao’an District,shenzhen,China. W:www.ginverter.com [email protected]


























