Becon Wbs2201 Scalp Scanner User Manual

Becon Wbs2201 Scalp Scanner User Manual

BECON logoUser Manual

With BEACON

Introducing WithBecon scalp scanner to care for your scalp healthy via AI analysis.
With an optical lens and diverse sensors, you could precisely analyze the scalp and observe changes.
A Real-time AI algorithm analyzes scalp data in 5 seconds.
Let’s make a healthy scalp care habit with the WithBecon scalp scanner.
FCC Compliance Statement
This device complies with part 15 of the FCC rules. Operation is subject to the following two conditions:

  1. This device may not cause harmful interference, and
  2. this device must accept any interference received, including interference that may cause undesired operation.

FCC Interference Statement
This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the
user is encouraged to correct the interference by one of the following measures:

  • Reorient or relocate the receiving antenna.
  • Increase the separation between the equipment and receiver.
  • Connect the equipment into an outlet on a circuit different from which the receiver is connected.
  • Consult the dealer or an experienced radio/TV technician for help.

FCC Caution
Any changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate this equipment. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter.

Device Parts

BECON WBS2201 Scalp Scanner

Measurement Button
Connect Status Indicator
Power Button
Charging Indicator
USB Type-C
Camera
Sensors
Sterilization LED
USB Type-C
Cable
Microfiber Lens Cleaner

Prerequisites

It is required to install WithBecon APP to connect the WithBecon scanner and Mobile device.
Please scan the QR code on the right and download WithBecon APP.
Please check a detailed manual through WithBecon APP.
Home > Setting > Manual > Scanner ManualBECON WBS2201 Scalp Scanner - qr code1

http://pf.kakao.com/_WxjsAs/chat?from=qr

How to use

BECON WBS2201 Scalp Scanner - How to use

  1. Please turn on/off the power by pressing the power button A for 3 seconds.
    1. Power On mode1. LED blinking 3 times per 1 second
    Power Off modeLED blinking 3 times per 1 second
  2. While power turns on, the LED B blinks rapidly. If the status changes to pairing standby mode, the LED B blinks slowly every 1 second.
    Pairing standby modeLED blinking 1 time per 1 second
    Paired modeLED steady on
  3. Please connect Bluetooth via WithBecon APP
  4. Please connect to Wi-Fi via WithBecon APP
  5. Please analyze via WithBecon APP
  6. Please Mount the body part on Cradle C to sterilize and disinfect.
  7. In case of a low battery, the red LED D on the left side will blink.
  8. During charging red LED will be on and when charging is complete, green LEDO will be on.
    BECON WBS2201 Scalp Scanner - samblyCharging over 90%
    BECON WBS2201 Scalp Scanner - sambly1Charging 30% – 90%
    BECON WBS2201 Scalp Scanner - sambly2Charging below 30%

Spec

Product NameWithBecon Scanner
ModelWBS2201
Maker / OriginBeacon Co Ltd
Size(W)67.5 * (D)30.9 * (H)104.3 (mm)
Weight123g
CertificationKC
BatteryLithium Polymer Battery2500mAh
Input Power5V / 100mA

Management and Precautions

  1. Please be careful not to the device in direct contact with water.
    – There is a high risk of malfunction if water contacts with camera and sensors
  2. Please wipe the camera and sensor areas with a microfiber lens cleaner.
  3. Please be careful not to let foreign matter enter the holes in the camera and sensor areas.
  4. Please do not apply strong impact, throw, or shake.
  5. Please do not disassemble, modify or repair the device yourself.
  6. Please keep the device away from infants and children.
  7. If the device becomes abnormally hot or deformed while charging, stop charging and contact customer service.
  8. If there is an abnormal operation, press the power button for 3 seconds to restart.
  9. If there is an abnormal operation even, in this case, 8, press the power button and the measurement button for 7 seconds to reset the device and restart.
  10. Please only use the genuine charging cable that WithBecon provides.
  11. Please do not operate it when it is charging

BECON WBS2201 Scalp Scanner - How to usehttps://withbecon.onelink.me/AeSL/7bee8efc?af_qr=true

If there is an issue with the device, you can contact us through the KakaoTalk channel or Email.
KakaoTalk channel (@withbecon)
Email: [email protected]

Customer Services

Your device is covered by WithBecon’s warranty for one year from the date of purchase. However, in the following cases, it is paid for even within the free period.

  1. In case of malfunction due to the water, beverages, or other foreign substances enter into the device
  2. In case of malfunction due to impact on the device
  3. In case of malfunction due to incorrect use of operating a voltage or a charging cable
  4. If the product is damaged by disassembling
  5. In case of malfunction due to a natural disaster
  6. In case of malfunction due to not following the management method and precautions in the manual
  7. In case of failure due to the customer’s other negligence

However, you can receive free A/S if you prove that it is not a consumer’s negligence or it meets A/S criteria.

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals