V I V O Mount-vp02b Black Extending Projector Ceiling Mount Instruction Manual

MOUNT-VP02B Black Extending Projector Ceiling Mount

Product Information

The Black Extending Projector Ceiling Mount (SKU: MOUNT-VP02B)
is a versatile mounting solution designed to securely mount
projectors to ceilings. The mount can support up to 30lbs (13.61kg)
and comes with various hardware options for drywall, wood stud,
brick, and concrete mounting. The package includes an arm mount,
bracket, and necessary hardware to assemble and install the mount.
The product also comes with an instruction manual and warning
labels for safe usage.

Product Usage Instructions

  1. Verify your ceiling construction before installation. Use wood
    studs for mounting or contact the manufacturer if unsure.
  2. Use the provided drill, Phillips screwdriver, and hardware to
    assemble the mount according to the instruction manual.
  3. Run cables through the arm or ceiling before mounting the mount
    to the ceiling.
  4. Mount the top plate of the arm to the ceiling using bolts and
    washers according to the drywall or concrete/brick mounting
    instructions.
  5. Attach the bracket to the arm using spacers, plates, bolts, and
    washers.
  6. Adjust the arms of the bracket to fit the mounting holes of
    your projector and secure using bolts and washers.
  7. Hook the mount to bolts in the bottom of the arm and secure
    using bolts and washers.
  8. Adjust the height and tilt of the mount using the allen
    wrench.

Note: Do not exceed weight capacity. Adult supervision is
required when assembling and installing the mount. Verify your
ceiling construction before installation. If any parts are received
damaged or defective, please contact the manufacturer for a
replacement.

Black Extending Projector Ceiling Mount
Instruction Manual

SKU: MOUNT-VP02B
Scan the QR code with your mobile device or follow the link for helpful videos and specifications related to this product. https://vivo-us.com/products/mount-vp02b
GET IN TOUCH | Monday-Friday from 7:00am-7:00pm CST

[email protected]

www.vivo-us.com Chat live with an agent!

309-278-5303

WARNING!
If you do not understand these directions, or if you have any doubts about the safety of the installation, please call a qualified technician. Check carefully to make sure there are no missing or defective parts. Improper installation may cause damage or serious injury. Do not use this product for any purpose that is not explicitly specified in this manual. Do not exceed weight capacity. We cannot be liable for damage or injury caused by improper mounting, incorrect assembly or inappropriate use.
WARNING: CHOKING HAZARD
SMALL PARTS – NOT FOR CHILDREN UNDER 3 YEARS. ADULT SUPERVISION IS REQUIRED.
PACKAGE CONTENTS

A (x1) Arm Mount

B (x1) Bracket

C (x1) Bracket

M-A (x4) M3x8
M-F (x4) M4 OD-10
Washer

M-B (x4) M4x10
M-G (x4) M5 OD-12 Washer

M-C (x4) M5x10
M-H (x4) M6 OD-12 Washer

M-D (x4) M6x10
M-I (x6) M5x12

M-E (x4) M3 OD-10 Washer
M-J (x6) M5 OD-10 Washer

M-K (x6) M5 OD-10 Plastic Washer

M-L (x2) D5-12

M-M (x2) M5-12

W-A (x4) Screw

W-B (x4) Anchor

WASHER SPECIFICATION KEY M Compatible Screw Size OD Outside Diameter

W-C (x4) M6 OD-16 Washer

T-A (x1) Allen Wrench

NOTE: SOME HARDWARE INCLUDED MAY NOT BE USED

CAUTION!
DO NOT INSTALL INTO DRYWALL ALONE. VERIFY YOUR CEILING CONSTRUCTION. USE WOOD STUDS TO MOUNT. We include mounting for brick and concrete. If unsure, please contact us at vivo-us.com, email at [email protected], or call us at 309-278-5303.
2

TOOLS NEEDED

Drill

Phillips

Screwdriver

ASSEMBLY STEPS
STEP 1
OPTION A: Run cables through arm (A).

DO NOT EXCEED WEIGHT CAPACITY.
30lbs Failure to do so may result in serious injury. (13.61kg)

A
OPTION B: If running cables through ceiling, pull cables through top plate of arm (A).

A 3

STEP 2
OPTION A: Drywall Mounting Use top plate of arm (A) to mark mounting holes on ceiling. Using a 3/16″ drill bit, drill approximately 2.2″ into ceiling stud. Put arm (A) in place and mount to the pre-drilled holes using bolts (W-A) and washers (W-C) as shown in diagram.
X
W-C W-A

1

2

3

4

STEP 2 (Continued)
OPTION B: Concrete/Brick Mounting Use top plate of arm (A) to mark mounting holes on ceiling. Using a ” drill bit, drill approximately 2.4″ into ceiling. Use concrete anchors (W-B), bolts (W-A), and washers (W-C) to mount the arm (A) as shown in diagram.
W-B
W-C W-A

1

2

5

STEP 3
Mount bracket (B) to arm (A) using spacers (M-L), plates (M-M), bolts (M-I), and washers (M-J, M-K). Tighten using the allen wrench (T-A).

M-M M-L
M-J M-K
M-I

T-A

M-M

M-L

B

STEP 4
Adjust arms of the bracket (C) to fit the mounting holes of your projector. Use bolts (M-A, M-B, M-C, M-D) and washers (M-E, M-F, M-G, M-H) depending on the size of mounting holes in your projector.

M-A/M-B/M-C/M- D

C

M-E/M- F/M-G/M- H

6

STEP 5
Hook the mount (B) to bolts in bottom of mount (A). Secure using bolts (M-I) and washers (M-J, M-K) as shown in diagram. Tighten using the allen wrench (T-A).
M-J M-I
M-K T-A
STEP 6
Adjust height and tilt of mount using the allen wrench (T-A).

T-A

-15° +15°

+15° -15° 7

Love your new VIVO setup and want to share? Tag us in your photo! @vivo_us

LAST UPDATED: 08/04/2022 REV1.1

Open Monday – Friday 7:00am – 7:00pm CST, our dedicated support team can offer immediate assistance with rapid response times. If any parts are received damaged or defective, please contact us. We are happy to replace parts to ensure you have a fully functioning product.

309-278-5303

AVG. RESOLUTION TIME (within office hrs): 5M 4S

www.vivo-us.com
Chat live with an agent!

AVG. RESOLUTION TIME (within office hrs): < 15 M

[email protected]

AVG. RESPONSE TIME (within office hrs): 1HR 8M – 23% within < 15m – 38% within < 30m – 61% within < 1hr – 83% within < 2hr – 92% within < 3hr

FOR MORE VIVO PRODUCTS, CHECK OUT OUR WEBSITE AT: www.vivo-us.com

References

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals