NE8MX6-T CAT6A Cable Connector
Product Information: etherCON NE8MX6-T & NE8MX6-B-T CAT6A
Cable Connector
The etherCON NE8MX6-T & NE8MX6-B-T CAT6A Cable Connector is
a high-performance connector for transmitting digital audio and
video signals in a variety of applications. It features a robust
design that ensures reliable performance and easy installation. The
connector is compatible with solid and stranded wire and supports
AWG 26/1 – AWG 24/1 (solid) and AWG 27/7 – AWG 24/7 (stranded) wire
sizes.
Tools Required for Assembly
- HX-CAT6A or pliers wrench
- Wire cutter
- Cable pulling lubricant
Product Usage Instructions
- Slide the boot (1.) and the chuck (2.) onto the cable. To ease
the boot assembly, apply some cable pulling lubricant to the cable
ends. - Prepare the cable as shown and strip the jacket at a length of
40 mm.
- S / FTP: Cut off braided shield to approx 10 mm and fold the
shield backwards. - U / FTP: Remove the foil of the paired wires and bend back the
drain wire for easier handling during assembly. Drain wire to be
used for grounding. - SF / UTP: Cut off braided shield to approx 10 mm and fold the
shield backwards. Cut and remove the foil screen.
management as per below wiring scheme, either T568A or T568B.
together. Attention: Distance between the cable jacket and the wire
management shall not exceed 15 – 17 mm.
0.5 mm.
Align the coding nibs of the ground shells to the grooves in
between the wire pairs in the wire management.
shield wires circumferentially. Put the drain wire over the ground
shell and wrap the drain wire circumferentially.
ground shell towards the end-position. Attention: Align the slots
of the chuck to the ribs of the ground shell.
Attention: Align the side of the wire management with wire numbers
1/2, 8/7 to the side of the housing that has the Neutrik logo and
the slot. Slide the gasket onto the chuck.
connector.
R
ASSEMBLY INSTRUCTION etherCON NE8MX6-T & NE8MX6-B-T
CAT6A Cable Connector
Tools:
l HX-CAT6A or pliers wrench l Wire cutter l Cable pulling lubricant
A
1.
2.
Insulation Diameter: > 1.10 mm
Wire Size:
AWG 26/1 – AWG 24/1 (solid)
AWG 27/7 – AWG 24/7 (stranded)
A Slide the boot (1.) and the chuck (2.) onto the cable.
To ease the boot assembly apply some cable pulling lubricant to the cable ends.
B
1.
2. A
10 mm
B C 3.
10 mm 6 mm
40 mm S / FTP U / FTP
SF / UTP
B 1. Prepare the cable as shown and strip the jacket at a
length of 40 mm.
2. A. S / FTP Cut off braided shield to approx 10 mm and fold the shield backwards. B. U / FTP Remove the foil of the paired wires and bend back the drain wire for easier handling during assembly. Drain wire to be used for grounding. C. SF / UTP Cut off braided shield to approx 10 mm and fold the shield backwards. Cut and remove the foil screen.
3. Remove the pair screening (if existing) to max. 6 mm.
4.
C
Component side!
BDA 462 V4
1287
B 1 A21A28 7
4. Presort and untwist the pairs as shown.
C Insert the wires into the designated position of the wire
management as per below wiring scheme, either T568A or T568B
Component side!
12 87
36 45
Connection
Color code
T568A
T568B
W – G G
W – O BL
W – BL O
W – BR BR
W – O O
W – G BL
W – BL G
W – BR BR
RJ 45 PIN No.
1 2 3 4 5 6 7 8
Page 1
etherCON CAT6A – ASSEMBLY INSTRUCTION
B
B
1287
12 87
D
max. 0.5 mm
2.
3.
E
B 1 A21A28 7
1287
B 1 A21A28 7
1.
15 – 17 mm 1.
D 1. Use HX-CAT6A or pliers wrench to press the wire
management together.
Attention: Distance between the cable jacket and the wire management shall not exceed 15 – 17 mm.
2. Cut all wires with a wire cutter. Allow wires to protrude max. 0.5 mm.
3. Remove the assembly guidance.
E Position the ground-shells over the wires as shown.
Attention: Align the coding nibs of the ground shells to the grooves in between the wire pairs in the wire management.
A B
F A S / FTP & SF / UTP
B U / FTP
B 1 A21A28 7
B 1 A21A28 7
G
BA
B 1 A21A28 7
H
B 1 A2 A 8 7
F A. Put the cable-shield over the ground shell and
distribute the shield wires circumferentially. B. Put the drain wire over the ground shell and
wrap the drain wire circumferentially.
G Slide the chuck over the cable-shield / drain wire and
the ground shell towards the end-position. Attention: Align the slots of the chuck to the ribs of the ground shell.
H Slide the pre assembled cable (step G) into the housing.
Attention: Align the side of the wire management with wire numbers 1/2, 8/7 to the side of the housing that has the Neutrik logo and the slot.
Slide the gasket onto the chuck.
I
12A8 7
I Finish the installation by turning the bushing onto the
connector.
Neutrik AG Neutrik Americas Inc. Neutrik (UK) Ltd. Neutrik Vertriebs GmbH
LI USA UK DE / NL / AT/DK
T: +423 / 237 24 24 T: +1 704 / 972 3050 T: +44 1983 / 811 441 T: +49 8131 / 280 890
F: +423 / 232 53 93 F: +1 704 / 438 9202 F: +44 1983 / 811 439 F: +49 8131 / 280 830
Neutrik France
FR
Neutrik Tokyo Ltd.
JP
Neutrik Hong Kong Ltd. HK
T: +33 1 / 4131 6750 T: +81 3 / 3663 4733 T: +852 / 2687 6055
F: +33 1 / 4131 0511 F: +81 3 / 3663 4796 F: +852 / 2687 6052
I I Draft. Nr.: BDA 462 V4 Update: 2022-08-03 Data subject to change without prior notice. © 2022 NEUTRIK®. NEUTRIK® are registered trademark of Neutrik AG. ALL RIGHTS RESERVED.
R
www.neutrik.com
Page 2















