
Cedar
No Dig Fencing System
Install
Panel ring rests on top of stake sleeve Bottom gate hinge rests or top of base panel ring
Drop post through rings & hinges then into stake sleeve
Swing attached Base Unit into place Use Post to mark next stake position
Continue adding panels, using the panel to mark the position of the next stake 
Left panel (lower) rings to rest on top of stake sleeve Right panel (raised) rings to rest on top of left panel rings Push post through all rings and into stake sleeve
Gate Latch Installation
Drill pilot 1/16″ holes in positions shown and attach latch to wood picket with Phillips screws.
Gate halves must be installed with 1/2″ between and with top rails aligned

Gate Adjustment

Questions, problems, missing parts? Before returning to your retailer, call our customer service department at 800.607.6409, 8:00 am — 5:00 pm EST Monday — Friday. Or eMail us at [email protected]














