Metalcraft Gp937 Greenhouse Instruction Manual

GP937 Greenhouse

Product Information

The GP937 is a quality greenhouse measuring 433 x 250 x 228cm.
It features self-tapping screws to provide strong joints and
includes base anchor brackets with expanding bolts for secure
fixing into concrete or paving. The two-part eaves beam includes an
integral gutter, and downpipes are included as standard so you can
collect rainwater. The roof vents come with manual window handles,
and automatic roof vent openers are available as an inexpensive
optional extra. This greenhouse is painted aluminum and is
scratch-resistant.

Product Usage Instructions

  1. For safety purposes, assemble the greenhouse with at least two
    people. Wear gloves, shoes, and safety goggles during
    assembly.
  2. Be careful when handling metal components as some have sharp
    edges.
  3. Lay all of the components on a soft carpet or blanket to avoid
    any scratches or damages.
  4. Do not climb or stand on the roof and avoid leaning heavy
    articles against the greenhouse.
  5. Keep the roof and gutter clear of snow, dirt, and leaves.
    Allowing snow to build up on the roof may damage the product.
  6. Clean the product with a mild detergent solution and rinse with
    cold clean water. Do not use acetone, abrasive cleaners, or strong
    detergents to clean the panels.
  7. Use the provided free tool and additional tools (not provided)
    to assemble the greenhouse.
  8. If you choose polycarbonate sheet as glazing panel, rubber is
    not provided.
  9. Remove approximately 2 inches of film from all sheet edges
    before installing, and remove all film immediately after
    construction is completed. Ensure that the side with the white film
    faces outwards.
  10. If you require automatic roof vent openers, GM80001 is sold
    separately.

Assembly instruction
MODEL:GP937 PRODUCT SIZE(LxWxH): 433 X 250 X 228CM PLEASE READ CAREFULLY BEFORE ASSEMBLY

CONTENTS
1. Assembly Advice ……………………………………………………….Page 1 2. Product Features ……………………………………………………….Page 2 3. Parts List …………………………………………………………………..Page 3 4. Door Assembly ………………………………………………………….Page 4 – 5 5. Roof Vent Assembly ………………………………………………….Page 6 – 7 6. Base Assembly ………………………………………………………….Page 8 7. Framework & Glazing Assembly …………………………………Page 9 – 22

Assembly and Maintenance Advice
1. For safety purposes, we strongly recommend that this product is assembled by at least two people.
2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly.
3. Lay all of the components on a soft carpet or blanket to avoid any scratches or damages. 4. DO NOT climb or stand on the roof. Heavy articles should not be leaned against
the greenhouse. 5. Keep the roof and gutter clear of snow, dirt & leaves. Allowing snow to build up on
the roof may damage the product. 6. Unlike steel, if the paint finish is scratched this will not harm the aluminium underneath. 7. When your product needs cleaning, use a mild detergent solution and rinse with cold
clean water. Do not use acetone, abrasive cleaners or strong detergents to clean the panels.
Tools Provided:
Free Tool
Tools Required when Assembly (Not Provided)
Assembly at least by two Persons
Important:
Rubber is not provided if you choose polycarbonate sheet as glazing panel.
1

Functions and Features:
1. Base anchor brackets are included as standard with expanding bolts to ensure a secure fixing into concrete or paving. Alternatively, you can use the brackets to fix into a timber base with wood screws (not provided).

Expansion bolt in concrete

Steel bar/Lawn land

2. The strong two part eaves beam includes an integral gutter. Downpipes are also included as standard so you can collect rainwater.

3. Manual window handles are included as standard with the roof vents. If required, automatic roof vent openers are available as an inexpensive optional extra.

GM80001

Manual Opener

Automatic Opener

GM80001 is sold separately

4. Remove approximately 2 inches of film from all sheet edges before installing and remove all film immediately after the construction is completed. Please ensure that the side with the white film faces outwards.

5. This quality greenhouse features self-tapping screws to provide strong joints. As the name suggests, the screws tap their own thread. Driving in self-tapping screws requires more force than conventional screws. A powered screwdriver is therefore recommended.
2

PART NO QTY L01A 2 L01B 2 L01C 2 L01D 2 L02A 10 L02B 10 L02C 1 L02D 1 L02E 1 L02F 1 L02G 1 L03A 2 L03B 2 L04A 10 L04B 1 L05B 4 L05B 15 L06C 1 L06D 1 L07C 2 L07D 2 L08C 2 L08D 3 L09C 2 L09D 2 L10 1 L13A 1 L14 1 L23A 2 L23C 4 L23D 5 L23E 6 L23F 2 L25 4

PART NO QTY

J01 2 J02R 2

J02L 2

J03R 1

J03L 1

J05 4

J07 4 J08 4 W01 8 W02 4

W07 1

W08 4

W011 2

S01 M6X12
S02 M6X20
M01 M6
Z01 Ø4X25
Z02 Ø4X16D
Z03 Ø4X10
Z04 M4.2X16

288 3
291 32 32 10 14

PART NO QTY Y1 2 Y2 6 Y3 1 Y4 2 Y5 1 Y6 14 Y7 10 Y8 1 Y9 8 Y10 4 Y11 6 Y13 1
Rubber
PART NO QTY J11 148.4M
Rubber for walls & roof (Provided for glass only)
PART NO QTY J11 93.9M
Rubber for walls only (Provided for glass only)

WindowsX4
Part NO. QTY. L11A 4 L12A 4 L19 8 L20 4 L21 4 W06 4

Door
Part NO. QTY. L18A 3 L18B 1 L15 2 L16A 1 L16B 3 L17 2

PART NO D1 D2 C2

QTY 2 2 2

GMDJ-101

4

GMDJ-102

2

GMDJ-103

2

S01 M6X12

24

M01 M6

24

Z04 M4.2X16

40

3

Part NO. QTY. Part

L18A 2

L15 1 L16A 1 L16B 1

L17 1

Z01 Ø4X25

16

NO. QTY. Y11 3

Left Door

Y11 Y11 Y11

Z01 Z01
Z01

L18A

L15 L16A

L16B L17

Z01
L18A Z01

Z01

4

Part NO. QTY. Part

L18A 1 L18B 1

L15 1

L16B 2

L17 1

Z01 Ø4X25

16

NO. QTY. Y11 3

Right Door

Z01 Z01
Z01

L18B

L15 L16B

L16B L17

Y11 Y11 Y11

Z01 L18A
Z01
Z01

5

Part NO. QTY. Part L11A 1 L12A 1
L19 2
L20 1 L21 1 W06 1
Z02 6
Ø4X16D
Z03 2
Ø4X10
Z04 2
M4.2X16

NO. QTY. Y10 1

Z03 Z03
W06

Windows Assembly
Step 1

Y10

Step 2

Z02 Z02 L19

Z02

Z02

Y10

L19

Step 3 6

L12A Z02
L11A L11A L12A Z04
L11A is factory fitted to L12A already
Four windows are standard
7

PART NO QTY

D1 2

D2 2

C2 2

GMDJ-101

4

GMDJ-102

2

GMDJ-103

2

S01 M6X12

24

M01 M6

24

Z04 M4.2X16

40

FRONT

100 About 100mm distance between two Z04

GP937

BACK

50 511 511 511 511 511 511 511

C2

D2

D1

D1

D2

C2

DJ101

DJ103

DJ102

S01

L06D L05D L07D L05D L08D L08D L05D L07D L05D L06D
8

a= b
Fix the base before assembly the greenhouse. This is the way to fix the base.
b a
L06C L05C L07C L05C L08C L08C L05C L07C L05C L06C

PART NO QTY

Y1 2 Y2 6

Y3 1

Y4 2 Y5 1

Y6 14 Y7 10

Y8 1

Y9

8

Y10 4

Y11 6

Y13 1

GP937

Y8 Y3

Y4

Y1

Y2

Y2

Y2

Y2

Y11

Y11

Y2

Y2

Y11

Y11

Y1

Y11

Y11

Y4

Y5 Y13

Attention:

If glass is chosen, please seal it with rubber(J11) provided after the whole assembly is finished.
Rubber is not provided if you choose polycarbonate sheet as glazing panel.

9

PART NO QTY

L01A 2

L01B 2

L03A 2

L08C 2

L08D 3

L10 1

Z04
M4.2X16 40

S01 M6X12

12

M01 12
M6

L01A

L03A

L01B

L01B

L03A

L01A&B

L03AL03A

L01A

S01 S01
M01

S01S01 M01M01

1. Fix the glazing bars (2 x L01A, 2 x L01B and 2 x L03A) to the cills (L10, L08C & L08D) with S01 & M01 provided.
2. Fix the cills to the base with Z04, using a powered screwdriver. See Page No. 7 for details.

L08D

L08C

L10

L08D L08D

L08C

L10

L08

Z04

10

PART NO QTY

L07C 2 L07D 2

L23C 2

L23D 2

S01 M6X12

16

M01 16
M6

1. Fix 2 x L07C and 2 x L07D eaves to L01A/L01B and L03A, using S01 & M01. 2. Fix 2 x L23C and 2 x L23D to L01A/L01B and L03A, using S01 & M01.

L07C

1

L07D

2

L07C

1

L23C

3 L07D

2

1

4

L23D

L23C

3

3

1

L23D

4

3

1 S01

2 L07C L07D
M01 M01
S01

3
S01
M01

4
L23C
M01

S01
L23D

11

PART NO QTY

L02C 1 L02D 1

L02E 1

L02F 1

L02G 1

L23A 2

L23D 1

L05A 4

S01 M6X12

20

M01 19
M6

L02G L02F

L02E

L02C

L02D

Fix L02C & L02D to cill L10; L02E, L02F

and L02G to cill L08D, using S01 & M01.

L02C&D&E&F&G

L02C&D&E&F
S01

L02G
S01

Slide 2 * S01 into L02G bolt channel.

S01 M01

Fix bracings 4 x L05A, 2 x L23A and 1 x L23D as below, using S01 & M01

L23D

1 2

2 2

L05A

3

L05A

1

3 L23A 2

2 L23A

4

4

S01

L05A

1

M01

4

4

2
S01 M01

3
M01
12

4

S01

M01

S01

Fix L02A (10pcs) to L08C/L08D and L07C/L07D using S01 & M01.

L02A

2

2 2

2 3 3
3

3 3

2 2
3 3

2 2 3 3

Slide 2 bolts (S01) into each L02A bolt channel. One is to fix L23C/L23D, the other is to be used later for fixing L05B

PART NO QTY

L04A 6

Y6 14

S01 M6X12

12

M01 12
M6

1

2 2

2

L04A

3

L04A

3

2

L04A

2 1
L04A

S01X2
1

Fix bracings L04A (6pcs) as above, using S01 & M01.

2

L04A

L04A

L04A

3 L04A

Y6

Y6

Y6

Y6

Y6 Y6 Y6

Y6 Y6 Y6

Y6

Y6

Y6

Y6

Slide the glazing panel Y6 into positions
14

PART NO QTY

L04B 1

L13A 1

S01 M6X12

10

M01 9
M6

Y1 2

Y3 1

4 3
L04B L13A
1 2
5

Y4 2

Y5 1

Y8 1 Y13 1

L13A

S01X2

1

3

2

S01

L02C L02D

S01

L13A

L13A

M01

M01

L04B Fix L13A to L02C & L02D with S01 & M01.

Slide 2*S01 into S01X2 the channel of L04B

4

S01

L02E L02F

S01

M01

M01
Preload the bolts S01 & M01 to L02E & L02F before sliding the panels into positions.

5 L04B

S01 M01

Y4 Y8 Y3 Y1
Y5 Y13
Y1 Y4

Slide the glazing panels Y1, Y3, Y4

15

Y5, Y8 and Y13 into positions.

PART NO QTY

L01C 2 L01D 2

W01 2

W02 4

S01 M6X12

20

M01 22
M6

L01D

1

2

L01C

1

L01D

2

2

3

3 4

4 4
5

5

L01C
2
4 5

1
L01C&D
M01 S01

2
L01C&D
M01 S01

3

4

M01

W01

M01 W02

1. Preload S01 & M01 on L01C and L01D before fixing

L01C&D

them to L01A/L01B. See figue 1 & 2.

5

S01

2. Bolt L01C and L01D with plate W01, using S01 & M01 preloaded. And then fix them to L04B and L02G,using

S01 & M01.

3. Fix L01C & L01D to L02C & L02D/L02E & L02F with M01 the plate W02, using the S01 and M01 preloaded

above.

4. Fix L01C & L01D to L01A & L01B,using S01 & M01.

16

PART NO QTY

L03B 2

L23E 6

W01 6

S01 M6X12

22

M01 22
M6

L03B
1 3
W01

W01
3 2

3 L03B 3
W01
1

1
Fix glazing bars L03B (2pcs) to the eaves and the ridge L07C profiles using S01 & M01

S01
M01
L07D

L03B

Fix plates W01 (2pcs) to L03A & L03B using S01 & M01.

S01

M01

W01

2

3 L03A&B

M01

W01 S01
W01
Fix plates W01 (2pcs) to the two L03B using S01 & M01.

L23E
Fix L23E(6pcs) to L03A and L03B using S01 & M01.

17

PART NO QTY

L06C 1

L06D 1

L02B 10

S01 M6X12

78

M01 48
M6

Bolt the ridge L06C & L06D to L01C, L01D and L03B, using S01 & M01.

L06C 1 L06D 2
1

1
S01
M01

2
S01

L06C

M01

L06D

S01

Fix glazing bars L02B (10pcs) to the eaves and the ridge profiles with S01 & M01

L02B
4 4

L02B
4 4
4

3 3 3

3 3

Slide 3 bolts (S01) into each L02B bolt channel to be used later.

L02B

S01X3

L02B
3

L06C&D L02B
4
S01

L02B

L07D

S01 L07C
M01

M01
18

PART NO QTY

L23C 2 L23D 2

L05B 15

W07 1

S01 M6X12

8

M01 M6

48

Z04
M4.2X16 2

L05B

4
5 5 5

1 5 2
3 5 L23C 1

L23D
2

Bolt L05B (15 pcs) to L02A & L02B using the S01 bolt placed in the bolt channel earlier.

1

L02B

2
S01

L02A

L05B

L05B

3
L23C
M01

4
S01
L23D

5
W07
S01 M01

Bolt L23C/L23D to L01C/L01D & L03B with S01 & M01.

Fix W07 to L06C & L06D from outside with self-tapping screws Z04, using a powered screwdriver.

Bolt L23C/L23D to L02B using the S01 bolt placed in the bolt channel earlier.

19

PART NO QTY

L04A 4 W08 4

WINDOW

4

Y7 10

Y9

8

S01 M6X12

24

M01 24
M6

Y9
WINDOW
Y9
WINDOW

Firstly, slide the glazing panel Y9 into the channel of L02B/L03B

L04A
S01X4

W08
S01 M01
L04A

L04A L02B&L03B

Slide 4 bolts (S01) into each L04A bolt channel. 2 to be fixed with W08, and another 2 to be fixed with L02B/L03B.

L11A

L11A

Slide the glazing panels into positions

S01X2

L02B&L03B

Slide 2 bolts (S01) into each L11A, and bolt it to L02B/L03B, using the S01 & M01.

Y7 Y7

Y7

Y7

Y9

Y7 Y9

20

PART NO QTY

L09C 2 L09D 2

L14 1

D00R-R 1

D00R-L 1

W011 2

S01 M6X12

6

S02 M6X20

3

M01

7

M6

After the panels and windows are in position, put some silicone sealant around to avoid leaking water.

L14
DOOR-L

L09D

L09C

DOOR-R

L09C & L09D

Slide 5 bolts (2*S01 and 3*S02) into L14 bolt channel. Bolt L14 to L13A with S02 & M01.

L07C & L07D
When the panels are completely inserted, fix gutter profile L09C & L09D.Tap it gently into position with a rubber mallet.

S01 S01
S02X3

L13A
M01 S02
L14

W11

W11

Slide 1*S01 into the bolt channel of L09C & L09D, fix W11 to L09C & L09D using S01 & M01.

21

PART NO QTY

L23F 2

J01 2

J02R 2

J02L 2

J03R 1

J03L 1

J05 4

L25 4

J07 4

J08 4

Z04
M4.2X16 4

Z02 Ø4X16D

8

Z03
Ø4X10 2

M01 M6

2

J01 J03L

L23F 2

1

3
J05
4
L25
5
J07

J02L

1 J01

2

2 J03R J02R 3
4 5
S01

M01

L23F

Fix the cover caps J01 into the ridge profile

Fix L23F (2pcs), one end to L14 and the other end to L09C/L09D through J02L/R, using the S01 preloaded and M01.

L14

Z03

J03L/R

Fix the cover caps (J03L/R) carefully with Z03.

Fix the cover caps (J02L/R) carefully

3 L23F

with Z02. Be careful

Z02

to ensure that the

screws are driven in

straight and in the

J05

correct position

(see detail drawings). L25

6

4

L25

J02L/R

Z04

5 L25
J08 J07

Drill a hole in L01A/L01B, approximately 3mm diameter and 700mmup from the bottom. Fix the J08 downpipebracket with Z04 screws and then clip the L25 downpipe into the J08 bracket.

If you wish to eliminate leaksuse glue when fixing the downpipebends (not provided).

22

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals