Thexceptional Ex140 Sit'n Kneel With Rockr Foot Installation Guide

EX140 Sit’n Kneel With ROCKr Foot

Product Information:

The EX140 Series ROCKrTM Sit’n KneelTM is a versatile product
designed to provide comfort and support while sitting or kneeling.
It comes in three different models:

  • EX140 – Basic model with a seat and two legs
  • EX142 – Includes a Tush PadTM for added comfort
  • EX144 – Includes a Tush PadTM and a Tool ToterTM Bucket for
    convenient tool storage

The product is proudly made in America and is part of the Made
in America initiative.

Product Usage Instructions:

STEP 1: Assembly Preparation

Before beginning assembly, make sure you have the following:

  • Phillips Screwdriver, #2
  • Hammer or Tapping Device

Product Components:

  • A Seat
  • B Leg, Left
  • C Leg, Right
  • D Foam pad
  • E Kneeler Foot (2X)

Hardware Pack:

  • F 2X 1/4-20 Screws

If any parts are missing, please contact our customer
service:

STEP 2: Assembly

Follow the diagram below to assemble the product:

Assembly Diagram

STEP 3: Pad Installation

Place the product on a flat surface. Test fit the foam pad to
understand alignment. Remove the adhesive backer and install the
pad firmly to ensure proper adhesion.

STEP 4 (Models EX142 & EX144): Tush
Pad Installation

If you have the EX142 or EX144 model, turn the product over to
the Sit’n Position. Test fit the Tush Pad to understand alignment.
Remove the adhesive backer and install the pad firmly to ensure
proper adhesion.

STEP 5 (Model EX144): Tool ToterTM Bucket
Installation

If you have the EX144 model, follow these steps to install the
Tool ToterTM Bucket:

STEP 1: Tube Installation

Slide a support tube into each slot sewn inside the tote body as
shown.

STEP 2: Strap Attachment

Tightly fold over the strap and attach the Velcro hook &
loop pads as shown. You may need to push hard as the tube nears the
bottom. There is a flap inside the slot that may feel like a
blockage or like it is sewn shut. It may take a harder push for it
to pass through.

®
EX140 Series ROCKrTM Sit’n KneelTM

EX140

EX142 With Tush PadTM

EX144 With Tush PadTM & Tool ToterTM Bucket

PLEASE HELP US BE BETTER OUR JOBS DEPEND ON IT

OR GIVE US
5 STARS

GIVE US 5 MINUTES

Something POSITIVE? Please share a positive
product review.

Something NEGATIVE or need improvement? PLEASE tell us directly

[email protected] 612-709-9534 – Text, photos or call

We do our absolute best to make things right
EVERY TIME

No product is perfect and ONE bad review destroys even the best ideas. We hope you choose discussion over destruction to give us a chance to make it right.
Be kind, be fair and be honest; while appreciating the well-intended hard work our team has enthusiastically dedicated. We appreciate your business and supporting our Made in America initiative.
Respectfully, TheXceptional Service Team

EX140 Series ROCKrTM Sit’n KneelTM

STEP 1
Before beginning assembly, you should have:

Assembly Tools Needed
Phillips Screwdriver, #2
Hammer or Tapping Device

Product Components

A Seat

B Leg, Left

C Leg, Right

A

D Foam pad

E Kneeler Foot (2X) C

B

D E

Hardware Pack

F

2X

1/4″-20

Screws

MISSING PARTS?

Send the following to [email protected]
or text 612-709-9534

1. Model Number & Place of Purchase 2. Letter & Description of missing part 3. Your Name and Address

Inquiries received by 2 PM CST will be
shipped same business day

STEP 2
A: Assemble as shown below F
E
A

F E

ASSEMBLY NOTE
For maximum stability, the legs are designed as a WEDGE FIT.
This MAY require tapping the seat onto one or both legs.
For best results ­ insert leg as far as possible with hands.Then turn kneeler over into sitting position as shown and TAP the seat onto legs. You may want to cover the area with something to protect the seat while tapping.

A B
C

Page 001

EX460 ROCK-IT KNEELER SEAT R1 rev:12/02/21

EX140 Series ROCKrTM Sit’n KneelTM

STEP 3
A: Place on flat surface as shown

B: Test fit pad to understand alignment

D

C: Remove adhesive backer and install as shown, pressing firmly to ensure proper adhesion

STEP 4 – Models EX142 & EX144
A: Turn over to Sit’n Position
B: Test fit Tush Pad to understand alignment
C: Remove adhesive backer and install as shown, pressing firmly to ensure proper adhesion

EX140 Series ROCKrTM Sit’n KneelTM

STEP 5 – Model EX144

EX60 Tool ToterTM Bucket
STEP 2
A: Slide a support tube into each slot sewn inside tote body as shown

Components

A Tool ToterTM

A

Body

B Support Tubes (3X)
B

B: Tightly fold over strap and attach the Velcro hook & loop pads as shown

Note: You may need to push hard as the tube nears the bottom. There is a flap inside the slot that may feel like a blockage or like it is sewn shut. It may take a harder push for it to pass through.

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals