Quick Start Guide
QG001003
TMD2636
TMD2636 EVM
Miniature Proximity Sensor Module
Out of the Box
For a detailed description of the TMD2636, please refer to User Guide:
- TMD2636_UG001002
Each TMD2636 Evaluation Kit comes with the following components:
Figure 1 :
Evaluation Kit Contents

| No. | Item | Description |
| 1 | TMD2636 Daughter Card | PCB with TMD2636 sensor installed |
| 2 | EVM Controller Board | Used to communicate USB to I²C |
| 3 | USB Cable (A to Micro-B) | Connects EVM controller to PC |
| 4 | Flash Drive | Includes application installer and documents |
Software Installation
- Plug the ams flash drive into an unused USB port
- Double-click the Setup.exe file on the flash drive, or click Start > Run and type E:setup.exe and press Enter. IMPORTANT: Use the appropriate drive letter in the above command to install the software. Flash Drive will commonly be assigned the next available drive letter for example C: hard drive, D: CD-ROM, E: flash drive
- The Setup Wizard will open and guide you through the installation of the TMD2636 host software, (Figure 2 through Figure 8)
- The EVM Controller board requires the installation of FTDI CDM drivers. If these drivers are not installed on your machine, this setup will automatically launch the installer for the FTDI drivers.
- At the end of the installation, click Finish to exit the setup.
| Figure 2: Welcome Screen | Figure 3: Liability Disclaimer |
![]() | ![]() |
| Figure 4: Select Installation Folder | Figure 5: Select Start Menu Folder |
![]() | ![]() |
| Figure 6: Installation in Progress | Figure 7: Information Screen |
![]() | ![]() |
Figure 8:
Installation Completed Successfully

Connect Hardware
Plug the TMD2636 daughterboard into the controller board (Figure 1). Always use ESD procedures when handling the EVM.
Using the enclosed USB cable, plug the micro-B connector into the EVM module. Using the other end of the cable, plug the USB A-connector into a USB port on the computer.
When the USB cable is connected, the green LED should light on power up to indicate that power is being received via the USB interface, and the controller board processor is running. If the green LED does not light, check the USB cable connections; unplug the USB cable and try again. If the green LED still does not light, check the PC for USB error messages.
Start the Application
To start the application select ams > TMD2636 EVM > TMD2636 EVM on the All Programs menu. The default installation directory depending on the device and the operating system you are using is:
C:\Program Files\ams\TMD2636_EVM (Windows 32-bit operating systems)
C:\Program Files (x86)\ams\TMD2636_EVM (Windows 64-bit operating systems)
A different install path may be selected by the user during the install (Figure 4). When started, the
TMD2636 window will open on the PC and automatically connect to the hardware.
Uninstall Application
To remove the software from your computer (Figure 9), select ams > TMD2636 EVM > Uninstall TMD2636 EVM or use the Windows Control Panel.
Figure 9:
Remove Installation

| Headquarters | Please visit our website at www.ams.com |
| ams AG | Buy our products or get free samples online at www.ams.com/Products |
| Tobelbader Strasse 30 | Technical Support is available at www.ams.com/Technical-Support |
| 8141 Premstaetten | Provide feedback about this document at www.ams.com/Document-Feedback |
| Austria, Europe | For sales offices, distributors and representatives go to www.ams.com/Contact |
| Tel: +43 (0) 3136 500 0 | For further information and requests, e-mail us at [email protected] |
Copyright ams AG. Trademarks Registered. All rights reserved. The material herein may not be reproduced, adapted, merged, translated, stored, or used without the prior written consent of the copyright owner.
ams AG shall not be liable to the recipient or any third party for any damages, including but not limited to personal injury, property damage, loss of profits, loss of use, interruption of business or indirect, special, incidental or consequential damages, of any kind, in connection with or arising out of the furnishing, performance or use of the technical data herein. No obligation or liability to recipient or any third party shall arise or flow out of ams AG rendering of technical or other services.
https://ams.com/ams-start
Document Feedback
TMD2636 ● TMD2636 EVM
Uninstall Application
Quick Start Guide • PUBLIC
QG001003 • v1-00 • 2021-Jan-18

























