Eagle Peak Greenhouse Staging Shelving Instruction Manual

Eagle Peak Greenhouse Staging Shelving Instruction Manual

EAGLE PEAK logo

EAGLE PEAK Greenhouse Staging Shelving

EAGLE PEAK Greenhouse Staging Shelving

SET UP THE SHELVES

  • Assemble the metal frame as shown in the below diagram.
    All the connectors are marked with letters that correspond to the letters in the assembly instructions.
  • There are two sets of shelves in this package.

NOTICE: Please make sure all the tubes are fitted together snugly with no gaps.

PARTS

EAGLE PEAK Greenhouse Staging Shelving-1

ASSEMBLY

EAGLE PEAK Greenhouse Staging Shelving-2

EAGLE PEAK Greenhouse Staging Shelving-3

EAGLE PEAK Greenhouse Staging Shelving-4EAGLE PEAK Greenhouse Staging Shelving (2 Pack)

EAGLE PEAK Greenhouse Staging Shelving-5

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals