Fire Garden 94800813 Tempest Ground Post Instruction Manual

94800813 Tempest Ground Post

Product Information

The TempestTM Ground Post (sku 94800813) is a permanent-mount
post designed for use with compatible Tempest models. It is
specifically designed for use with the following models:

  • Tempest Torch 24v (LP – 94900755 & NG – 94900745)
  • Tempest Torch Manual Start (LP – 94900753 & NG –
    9490043)
  • Tempest Lantern 20k – 24v (LP – 94900757 & NG –
    94900747)
  • Tempest Lantern 20k – Manual Start (LP – 94900756 &
    94900746)

Please note that the provided illustration and order of
installation in the manual are for example purposes only. It is
important to follow all gas line and post installation requirements
specific to your location. We recommend having the post installed
by a qualified installer and conducting a leak test on all
connections before use. For the installation of Tempest Lantern
50k, please refer to the next page.

Product Usage Instructions

  1. Determine a suitable location for the post.
  2. Dig a hole to the required depth for the post and pour a cement
    footing.
  3. Place the post into the footing, ensuring it is supported in a
    vertical position. Make sure the gas line access hole is pointed in
    the correct direction, at the correct depth, and provides enough
    space for gas line hook-up.
  4. Dig a trench to the required depth and install the gas line.
    Run the included flex line through the post and connect it to the
    gas line. It is recommended to cap the flex line and perform a leak
    test at this stage.
  5. Backfill the trench and the area around the post to meet local
    requirements.
  6. With the gas line shut off, install the Tempest according to
    the instructions provided in the Tempest manual. Before attaching
    the Tempest head, conduct a leak test on all connections. Turn on
    the gas and thoroughly test the operation of the Tempest.

Please note that for the installation of Tempest Lantern 50k,
refer to the instructions on the next page. It is crucial to adhere
to all gas line and post installation requirements specific to your
location, and conduct a leak test on all connections before
use.

TempestTM Ground Post
(sku 94800813)

Compatibility
This post is for use with the following permanent-mount Tempest models
Tempest Torch 24v (LP – 94900755 & NG – 94900745)
Tempest Torch Manual Start (LP – 94900753 & NG – 9490043)
Tempest Lantern 20k – 24v (LP – 94900757 & NG – 94900747)
Tempest Lantern 20k – Manual Start (LP – 94900756 & 94900746)
Tempest Lantern 50k ­ 24v (LP & NG – 94900748)
NOTE: The illustration and order of installation is for example only. Make sure to follow all gas line and post installation requirements for your location. We recommend the post be installed by a qualified installer. Leak test all connections before use.

Tempest Torch/Lantern 20k (for Lantern 50k see next page

Suggested Order of Installation
a) Determine a location for the post.
b) Dig the post hole to the required depth. Pour the cement footing and place the post into the footing, making sure to support the post in a vertical position. Make sure the gas line access hole is pointed the correct direction*, is at the correct depth, and leaves enough room for gas line hook-up.
c) Dig the trench to the required depth and install the gas line. Run the flex line included with this kit through the post and attach it to the gas line. You may wish to cap the flex line and leak test it at this time.
d) Back fill the trench and area around the post to meet all local requirements.
e) With the gas line shut off, install the Tempest (see the Tempest manual). Before attaching the Tempest head, leak test the connections. Turn on the gas and thoroughly test operation of the Tempest.

* The access hole is positioned so the front, sides, or back of the Tempest, when installed, is directly over the access hole (the mounting holes for the head are at a 45° angle to the access hole).

Page 1 of 2

17601537 – 4/14/2022

© Travis Industries, Inc.

TempestTM Ground Post
(sku 94800813)
Tempest Lantern 50k
NOTE: The illustration and order of installation is for example only. Make sure to follow all gas line and post installation requirements for your location. We recommend the post be installed by a qualified installer. Leak test all connections before use.
Suggested Order of Installation
f) Determine a location for the post. g) Dig the post hole to the required depth. Pour
the cement footing and place the post into the footing, making sure to support the post in a vertical position. Make sure the gas line access hole is pointed the correct direction*, is at the correct depth, and leaves enough room for gas line hook-up. h) Dig the trench to the required depth and install the gas line. Run the flex line included with this kit through the post and attach it to the gas line. You may wish to cap the flex line and leak test it at this time. i) Back fill the trench and area around the post to meet all local requirements. j) With the gas line shut off, install the Tempest (see the Tempest manual). Before attaching the Tempest head, leak test the connections. Turn on the gas and thoroughly test operation of the Tempest.
* The access hole is positioned so the front, sides, or back of the Tempest, when installed, is directly over the access hole (the mounting holes for the head are at a 45° angle to the access hole).

Page 2 of 2

17601537 – 4/14/2022

© Travis Industries, Inc.

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals