SUSSEX Voda Double Robe Hook Installation

Voda Double robe hook
Product code
VDRH Double robe hook
Installation guidelines
- This product is supplied pre-assembled within its packaging.
- Using the supplied 2mm Allen Key, loosen the Stainless Steel Set Screws and remove the Brass Wall Fixings.
- Choose the desired location, use the removed Brass Wall Fixing to mark-out the drilling holes.
NOTE: The Brass Wall Fixing must be mounted with the holes in the Horizintal direction. (See Fig.2)
- Drill the 6.5mm holes, fit the Tox Plugs and secure the Brass Wall Fixing using the Fastening Screws.
- Fit the Double Robe Hook over the Brass Wall Fixing, aligned square, and tighten the Stainless Steel Set Screws
Tapware is to be installed by a Licensed Plumber in accordance with AS/NZS 3500:2003 Recommended working water pressure 300-500 kpa. Maximum water temperature is 65 deg.c Copyright © Sussex Taps.
















