Jiobit 11062015 Smart Tag Next-gen Real-time Location Tracking User Guide

Jiobit 11062015 Smart Tag Next-gen Real-time Location Tracking User Guide

jiobit-logo

jiobit 11062015 Smart Tag Next-gen Real-time Location Tracking

jiobit-11062015-Smart-Tag-Next-gen-Real-time-Location-Tracking

QUICK START

Get Attached

  • ARROW-RIGHT INTEGRATED LOOP: Built in to the Jiobit itself. Use this for lacing onto wrist bands or lanyards.jiobit-11062015-Smart-Tag-Next-gen-Real-time-Location-Tracking-1
  • CURE LOOP: For button holes, belt loops, and fabric loops. (Not for rigid metal/plastic loops)jiobit-11062015-Smart-Tag-Next-gen-Real-time-Location-Tracking-2
  • EM LOCK CLIP: Clips and grips onto elastic waistbands, hems, and pockets.jiobit-11062015-Smart-Tag-Next-gen-Real-time-Location-Tracking-3
  •  STRAP CLIP: Perfect for locking to backpack straps, belts, and pet collars.jiobit-11062015-Smart-Tag-Next-gen-Real-time-Location-Tracking-4

Attach the device with the grey side facing AWAY from the body. More accessories and attachments available at Jiobit.com

Get Connected

  1. INSTALL THE JIOBIT APP Available for iOS and Android.
  2. SET UP YOUR JIOBIT Follow the instructions in the app to set up your account and select your plan (if you haven’t already).
  3. HELP THE BATTERY LEARN Set up your Trusted Places and invite Care Team members to get the most out of your battery.jiobit-11062015-Smart-Tag-Next-gen-Real-time-Location-Tracking-5

Regulatory & Safety Notices

MODEL NAME & NUMBER: JIOBIT 11062015

USA: Federal Communications Commission (FCC) statement.

This device complies with FCC part 15 FCC Rules. Operation is subject to the following two conditions:

  1. This device may not cause harmful interference.
  2. This device must accept any interference received, including interference that may cause undesired operation FCC warning. Changes or modifications not approved by JIO, Inc. could void the user’s authority to operate the equipment.

Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.

However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:

  • Reorient or relocate the receiving antenna.
  •  Increase the separation between the equipment and receiver.
  • Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
  • Consult the dealer or an experienced radio/TV technician for help.

This device meets the FCC requirements for RF exposure in public or uncontrolled environments. In accordance with FCC guidelines, Jiobit’s antenna must remain 6.5mm away from the skin. As such, Jiobit should be worn with the front facing away from the body.
FCC ID: 2AKLI-080716

References

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals