Lawson Fenning Lg Alta Brass Dome Instructions

LG Alta Brass Dome

Product Information:

The LF Collection is a line of products designed and handmade in
Los Angeles, California by Lawson Fenning. The collection includes
the Alta Brass Dome, available in two sizes: LG (large) and SM
(small). The Alta Brass Dome features a unique design and is made
from high-quality brass materials.

Product Usage Instructions:

Before handling the Alta Brass Dome, please wear gloves to
protect your hands from any potential harm.

Removing the Stem:

  1. Gently unscrew the stem by turning it counterclockwise to
    separate it from the dome.

Reattaching the Stem:

  1. Again, please wear gloves when handling the Alta Brass
    Dome.
  2. To reattach the stem, line it up with the opening on the
    dome.
  3. Gently screw the stem back into the dome by turning it
    clockwise.

Note: The Alta Brass Dome is available in two sizes. Please
ensure you are using the correct stem for the corresponding dome
size.

Important: All designs within the LF Collection
are the property of Lawson Fenning. Reproduction, modification, and
use for construction by any party other than Lawson Fenning is
prohibited.

For more information, please visit www.lawsonfenning.com.

www.lawsonfenning.com
The LF Collection, designed and handmade in Los Angeles, California

ASSEMBLY INSTRUCTIONS:
REMOVING THE STEM
PLEASE WEAR GLOVES WHEN HANDLING THE ALTA BRASS DOME. GENTLY UNSCREW THE STEM BY TURNING IT COUNTERCLOCKWISE TO SEPARATE IT FROM THE DOME.
REATTACHING THE STEM
PLEASE WEAR GLOVES WHEN HANDLING THE ALTA BRASS DOME. TO RE-ATTACH, LINE UP AND GENTLY SCREW THE STEM BY TURNING IT CLOCKWISE BACK INTO THE DOME.

PLAN
1521
ELEVATION
Made in LA

30

5

3

4

1043

4

Alta Brass Dome- LG

January 2022
All designs are property of Lawson Fenning. Reproduction, modification, and use for construction by
any party other than Lawson Fenning is prohibited.

www.lawsonfenning.com
The LF Collection, designed and handmade in Los Angeles, California

18
PLAN

ASSEMBLY INSTRUCTIONS:
REMOVING THE STEM
PLEASE WEAR GLOVES WHEN HANDLING THE ALTA BRASS DOME. GENTLY UNSCREW THE STEM BY TURNING IT COUNTERCLOCKWISE TO SEPARATE IT FROM THE DOME.
REATTACHING THE STEM
PLEASE WEAR GLOVES WHEN HANDLING THE ALTA BRASS DOME. TO RE-ATTACH, LINE UP AND GENTLY SCREW THE STEM BY TURNING IT CLOCKWISE BACK INTO THE DOME.

5

3

4

12

8

341

ELEVATION

Made in LA

Alta Brass Dome- SM

January 2022
All designs are property of Lawson Fenning. Reproduction, modification, and use for construction by
any party other than Lawson Fenning is prohibited.

References

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals