3PT-AC 300 Gallon 3-Point Sprayer Tank
Product Information
The 3-Point Mount Assembly (3PT-AC) is a component used in
conjunction with the Spot Sprayer to provide a stable and secure
mounting solution. It comes pre-assembled and requires minimal
installation. The assembly includes various parts such as the tank
assembly, 3-Point Rail, 3-Point Boom Mount, Frame, 3-Point Link,
3-Point Boom Bracket, and several bolts, nuts, and clamps.
Product Usage Instructions
- Before assembling the 3-Point Mount, ensure that you have
followed the instructions provided in your Spot Sprayer Assembly
Manual. - Make sure you have the necessary tools for assembly. The
required tools include a 1/2 socket wrench. - Refer to the Boom Assembly Instructions before installing the
Boom Kit to the 3-Point Mount. This step is the only requirement
for assembly. - For attaching the Boom Assembly to the 3-Point Mount, follow
these steps:- Line up the holes of the PNB Boom Assembly or the 620 Boom
Assembly with the holes of the Boom Brackets on the rear of the
3-Point Mount Frame. - Install the Boom Assembly using the provided bolts and flange
nuts from the Boom Assembly. Tighten them securely using a socket
wrench.
- Line up the holes of the PNB Boom Assembly or the 620 Boom
- Use your tractor’s height control to manage your spray height.
The Boom Upright Brackets that may come with the Boom Assembly are
not needed.
If you encounter any difficulties during assembly or have any
questions, please call our support hotline at 800.825.5397 for
assistance.
BEFORE ASSEMBLING YOUR 3-POINT MOUNT FOLLOW INSTRUCTIONS IN YOUR SPOT SPRAYER ASSEMBLY MANUAL
TOOLS REQUIRED
INCLUDED COMPONENTS
HAVING TROUBLE? CALL SUPPORT AT: 800.825.5397
Tank Assembly (1)
3-POINT MOUNT ASSEMBLY 3PT-AC
TOOLS TOOLS
1/2″ SOCKET WRENCH
NOTE:
THIS 3-POINT MOUNT COMES PRE-ASSEMBLED. ONLY STEP REQUIRED IS TO INSTALL BOOM KIT. FOLLOW BOOM ASSEMBLY INSTRUCTIONS BEFORE
INSTALLING TO 3-POINT MOUNT.
1a.
PARTS
NOTE: Reference Boom Assembly Card for needed components to install Boom Assembly to 3-Point Mount Frame. Boom Upright Brackets that may come with Boom Assembly are not needed. Use your Tractor’s height control to manage your spray height.
Line up holes of the PNB Boom Assembly with the holes of the Boom Brackets on the rear of 3-Point Mount Frame.
Attaches Boom Assembly to 3-Point Mount
Install with 4 Bolts and Flange Nuts from Boom Assembly. Tighten with a Socket Wrench.
1b.
PARTS
NOTE: Reference Boom Assembly Card for needed components to install Boom Assembly to 3-Point Mount Frame. Boom Upright Brackets that may come with Boom Assembly are not needed. Use your Tractor’s height control to manage your spray height.
Line up holes of the 620 Boom Assembly with the holes of the Boom Brackets on the rear of 3-Point Mount Frame.
Attaches Boom Assembly to 3-Point Mount
Install with 2 Bolts and Flange Nuts from Boom Assembly. Tighten with a Socket Wrench.
3-POINT MOUNT ASSEMBLY 3PT-AC
B. BREAKDOWN
ID Part Number Description
Qty
1 152IP
Implement Pin
2
2 31-100181 3-Point Rail
2
3 31-100182 3-Point Boom Mount
1
4 32-100079 Frame, 3-Point Link
1
5 31-100187 3-Point Boom Bracket
2
6 33-100113 Serrated Flange Nut 5/16-18 4
7 33-100116 Bolt 5/16 – 18 x 1″
4
8 33-100133 Nut 1/2 – 13
6
9 33-100134 Lock Washer 1/2″
6
10 33-100136 Nylon Lock Nut 3/8″
4
11 33-100177 Bolt – 1/2-13 x 1.25″
6
12 33-200020 Hex Bolt – 3/8-16 x 1″
4
13 TD-150
1.5″ Tie Down Clamp
4
TDS1.5-55 Tie Down Strap – 40 Gallon
14
2
TDS1.5-67 Tie Down Strap – 60 Gallon
HAVING TROUBLE? CALL SUPPORT AT: 800.825.5397


















