INSTALLATION INSTRUCTIONS
All wood and concrete subfloors must be flat within 1/8″ over a 6′ span, or 3/16″ over a 10′ span. All areas must be checked prior to installation.
► View Installation Videos and Tips at quietwalk.com/Iv-install
View limited Lifetime Warranty at duietwall ccomilv-warranty
GENERAL INFORMATION
Product may be installed over:
- QuietWalk LV be used over any subfloor approved by the finished floor covering manufacturer
- Suitable with Radiant Heat Systems
Recommended Uses: - Residential applications on all grade levels
- Floating Vinyl, Laminate, and Engineered Wood Floors
- Commercial double glue applications (4mm or thicker flooring)
- Interior use in dry, heated areas
Subfloor and Preparation: - All subfloors must be flat, clean, smooth, and dry
- Sand any rough surfaces and/or uneven joists
- Fill any cracks on concrete or panel joints wider than 1/8″ using a recommended patch/ leveling product
LAS INSTRUCCIONES DE INSTALACION
Toda la madera y los subsuelos concretos debe ser plana en mas de 1/8″a 6″ span o 3/16″durante un lapso de 10: Todas las areas deben ser verificados antes de la instalacion.
►Vea videos y sugerencias de instalaciOn en quielwalk.com/Iv-install
Gs Ver Garantia limitada de por vida en quietwalk.com/Iv-warranty
INFORMACION GENERAL
El producto puede instalarse sobre:
- QuietWalk LV se puede utilizar sobre cualquier contrapiso aprobado por el fabricante del revestimiento de piso terminado
- Adecuado con sistemas de calor radiante
Usos Recomendados: - Aplicaciones residenciales en todos los niveles de grado
- Pisos flotantes de vinilo, laminados y madera de ingenieria
- Aplicaciones comerciales de doble cola (pisos de 4 mm o mas gruesos)
- Uso interior en areas secas y calientes
Subsuelo y preparaci6n: - Todos los contrapisos deben ser pianos, limpios, lisos y secos
- Lije cualquier superficie rugosa y / o viguetas irregulares
- Rellene cualquier grieta en las juntas de concreto o paneles de mas de 1/8″usando un producto de parche / nivelacidin recomendado
INSTALLATION METHODS
Floating Floor Installation:
- Be sure the subfloor is clean, smooth, and free of dust and debris
- Unroll the QuietWalk Luxury Vinyl Underlayment and flip it over so the film side is up (felt side down)
- Make sure that underlayment seams run perpendicular (at a right angle) to the long dimension of the planks.
- Underlayment must be positioned with a minimum 4″ separation between seams of underlayment and seams of finished flooring products
- Trim the perimeter edges of the QuietWalk Luxury Vinyl Underlayment Vefrom the wall
- Butt seams together and seals using the factory attached lip and tape system.
- For seams that do not have the lip and tape feature, use a good quality single-faced tape to seal the seams
- Install the floor covering product according to the manufacturer’s instructions
Double-Glued Installation: - Double Glue Down installations are approved with flooring that is a minimum thickness of 4mm.
- Be sure the subfloor is clean and free of dust and debris
- Unroll the first drop of QuietWalk Luxury Vinyl Underlayment and flip it over so the film side is up (felt side down)
- Make sure that underlayment seams run perpendicular (at a right angle) to the long dimension of the planks
- Remove the lip portion of the lip and tape system with a utility knife and discard
- Remove the tape strip cover portion of the lip and tape system and discard
- Trim to fit the QuietWalk Luxury Vinyl Underlayment into the target areas.
- Move the trimmed-to-fit underlayment to the side to apply the adhesive
- Apply a recommended pressure-sensitive adhesive using the flooring manufacturer recommended trowel
- Once the adhesive has flashed (dried to a tacky touch) place the trimmed-to-fit underlayment into the adhesive
- Butt seams together and applies 2″wide clear packaging tape centered over the seam
- Roll the adhered QuietWalk Luxury Vinyl Underlayment with a 100 lb flooring roller
- Mark starting lines on Underlayment for placement of finished flooring product
- Apply a recommended pressure-sensitive adhesive using the flooring manufacturer recommended trowel
- Once the adhesive has flashed (dried to a tacky touch) you can begin flooring installation according to the manufacturer’s recommendations
- Make sure the staggered end joints fall at least Tawny from the underlayment seams
- Maintain a minimum expansion gap of ‘A’ around the perimeter of the room
- Follow flooring manufacturer recommendations for installing transitions in large-span applications and doorways
- Roll the finished floor with a 100 lb flooring roller
- Be sure not to slide flooring into a position that could potentially displace adhesive
Mechanically Fastened Hardwood Floors - Unroll the underlayment and ensure the vapor side is up and fibers are to the subfloor.
- Install underlayment in opposite direction to the flooring material. You can tape the seams but it is not necessary.
- Install the hardwood per manufactures written instructions, using their recommended fastening materials. Trim and Molding:
- All finish trim and transition moldings must be installed without binding or restricting the free movement of the above-finished flooring products
METODOS DE INSTALACION
Instalackm de Ito flotante:
- Asegorese de que el subsuelo este limpio, liso y libre de polvo y escombros
- Desenrolle la base de vinilo de lujo QuietWalk Luxury Vinyl y dele la vuelta para que la cara de la pelicula quede hacia arriba (boca abajo)
- Asegtirese de que las costuras del contrapiso se extiendan perpendicularmente (en angulo recto) a la dimensi6n larga de la tabla
- El contrapiso debe colocarse con una separaci6n minima de 4-entre las uniones de contrapiso y las costuras de los productos de piso terminado
- Recorte los border perimetrales del contrapiso QuietWalk Luxury Vinyl’ . “de la pared
- Junte las juntas y selle con el sistema de cintas y labios adjunto.
- Para las costuras que no tienen la caracteristica de punta y cinta, use una cinta de una cara de buena calidad para sellar las costuras
- Instale el producto que cubre el piso de acuerdo can las instrucciones del fabricante Instalacion con doble encolado:
- Las instalaciones de Double Glue Down estan aprobadas con pisos de un espesor minimo de 4 mm.
- Aseg6rese de que el subsuelo este limpio y libre de polvo y desechos
- Desenrolle la primera gota del contrapiso QuietWalk Luxury Vinyl y dele la vuelta para que el lado de la pelicula quede hacia arriba (boca abajo)
- Asegtirese de que las costuras del contrapiso se extiendan perpendicularmente (en angulo recto) a la dimensi6n larga de la tabla
- Retire la parte del labio del labio y el sistema de cinta con un cuchillo y deseche
- Retire la parte de la cubierta de la tirade cinta del labio y el sistema de cinta y desechela
- Corte para ajustar el contrapiso QuietWalk Luxury Vinyl en las areas objetivo.
- Mueva el contrapiso recortado para ajustar hacia un lado para aplicar el adhesivo
- Aplique un adhesivo sensible a la presiOn recomendado utilizando la paleta recomendada por el fabricante del piso
- Una vez que el adhesivo ha destellado (secado hasta un toque pegajoso) coloque la base recortada para ajustar en el adhesivo
- Junte las juntas y aplique cinta de embalaje transparente de 2″de ancho centrada sobre la costura
- Haga rodar la capa base QuietWalk Luxury Vinyl adhered con un rodillo para Piso de 100 lb.
- Marque las lineas de partida en el contrapiso para la colocaciOn del producto de piso terminado
- Aplique un adhesivo sensible a la presi6n recomendado utilizando la paleta recomendada por el fabricante del piso
- Una vez que el adhesivo ha brotado (secado hasta un toque pegajoso) puede comenzar la instalaciOn del piso de acuerdo con las recomendaciones del fabricante
- Asegthese de que las uniones finales escalonadas caigan al menos a 2″de las costuras de la base
- Mantenga un espacio de expansi6n minimo de 1/4″alrededor del perimetro de la habitacion
- Siga las recomendaciones del fabricante de pisos para instalar transiciones en aplicaciones de gran envergadura y puertas
- Haga rodar el piso terminado con un rodillo para piso de 100 lb.
- Asegtirese de no deslizar el piso en su posicion, lo que podria desplazar el adhesivo Pisos de madera noble con sujeci6n mednica
- Desenrolle el contrapiso y aseg6rese de que el lado del vapor este hacia arriba y las fibras ester) al contrapiso.
- Instale el contrapiso en direcci6n opuesta al material del piso. Puede pegar las costuras con cinta adhesiva, pero no es necesario.
- Instale la madera dura segun las instrucciones escritas del fabricante, utilizando los materiales de sujecien recomendados.
Recorte y moldura: - Todas las molduras de acabado y molduras de transicion deben instalarse sin atascarse o restringir el libre movimiento de los productos para pisos terminados anteriormente