AXDP 10 WATT Solar Panel
Product Information: Solar Panel
The Solar Panel is a device that converts sunlight into
electrical energy. It is designed to be used as a power source for
various applications.
Instructions:
NOTE: DO NOT connect solar panel directly to a
battery!
Before installing the Solar Panel, it must be located in an open
area that gets direct full sun for at least 8 hours per day. The
following tips should be considered while installing the Solar
Panel:
- Solar panels should be mounted so that foliage growth such as
tree leaves, tree branches, or weeds do not cover the solar panel
in a shadow at any point during the day, regardless of the time of
year. - Please refer to the solar map and chart to make sure you have
the correct amount of solar requirement for your area. - Minimum battery requirement for solar are two 12V, 7 Amp hour
batteries (ABBT2) or a 12V deep cycle marine battery. - To provide secure and moisture resistant splices for solar
panels use a direct burial splice kit for ALL splices. These splice
kits can be found at hardware and electrical supply stores. - For optimal efficiency, wipe the face of the panel frequently
with a soft, damp cloth.
Installing Your Solar Panel:
Step 1: Attaching Panel to Pipe
Position the curved pipe (D) and place two pipe clamps (C) over
the curved pipe. Thread the 4 M8 bolts (F) through the top and
bottom channels of the solar panel as pictured. Secure the M8 bolts
(F) with the M8 nuts (E).
Step 2: Securing Panel to Post
A. Determine the installation site for the solar panel. B.
Secure the solar panel assembly to a wooden post or fence using two
pipe clamps (C) and four lag bolts (B) as shown.
When installing two or more solar panels to the control panel,
connect the panels in parallel using weather-resistant wire nuts.
Do NOT connect the solar panels in series. The maximum output of
the combined solar panels must not exceed 40-Watts. The maximum
wire length between the control board and solar panels is no more
than 100 feet.
WARNING: NEVER USE THE SOLAR PANEL AND THE AC
TRANSFORMER AT THE SAME TIME! It will damage the control board and
void your warranty.
WARRANTY: This product can expose you to
chemicals including lead, which is known to the State of California
to cause cancer. For more information, go to
www.P65Warnings.ca.gov
SOLAR PANEL
INSTRUCTIONS
NOTE:
WARNING:
DO NOT connect solar panel directly to a battery!
BEFORE YOU INSTALL THE SOLAR PANEL IT MUST BE LOCATED IN AN OPEN AREA THAT GETS DIRECT FULL SUN FOR AT LEAST 8 HOURS PER DAY.
TIPS FOR SOLAR INSTALLATIONS:
1. Solar panels should be mounted so that foliage growth such as tree leaves, tree branches, or weeds do not cover the solar panel in a shadow at any point during the day, regardless of the time of year.
2. Solar panels should be cleaned periodically to remove any snow, dirt, grime, mold, or mildew that may accumulate and deteriorate the performance. 3. If this solar panel will be used with a GHOST CONTROLS® Gate Opener System, the power status LED indicator (shown)
on the GHOST CONTROLS® System Control Panel will help you align the panel for optimal charging performance. 4. The faster the power status light blinks the better the charge. If you have a solid status light your solar performance is good too. 5. A slow blinking light means too much shade or panel needs to be rotated to gain better charging performance. 6. Place the panel facing DUE SOUTH in the path of the sun. Many smartphones have a magnetic compass to aid you. 7. Mount the panel using the curved pipe provided to maintain the proper angle to the sun.
INSTALLING YOUR SOLAR PANEL: E
STEP 1: ATTACHING PANEL TO PIPE Position the curved pipe (D) and place two pipe clamps (C) over the curved pipe. Thread the 4 M8 bolts (F) through the top and bottom channels of the solar panel a pictured. Secure the M8 bolts (F) with the M8 nuts (E).
STEP 2: SECURING PANEL TO POST
C F
D E
C F
A. Determine the installation site for the solar panel. B. Secure the solar panel assembly to a wooden post or fence using two pipe clamps (C) and four lag bolts (B) as shown
in the illustration to the right. If your fence post is metal, you will need alternative hardware not provided, (e.g., U-clamps or sheet metal screws). *If the solar panel must be placed more than 10 ft. from the control box in order to receive direct sunlight, you can use up to 100 ft. of multi-stranded, GHOST CONTROLS® 16 gauge, direct burial, low-voltage wire (AXLV). NEVER use solid core wire.
IMPORTANT:
— Please refer to solar map and chart to make sure you have the correct amount of solar requirement for your area.
— Minimum battery requirement for solar are two 12V, 7 Amp hour batteries (ABBT2) or a 12V deep cycle marine battery.
— To provide secure and moisture resistant splices for solar panels use a direct burial splice kit for ALL splices. These splice kits can be found at hardware and electrical supply stores.
— For optimal efficiency, wipe the face of the panel frequently with a soft, damp cloth. — The output of the Solar Panel is variable during the day depending on the intensity of
the sun and the angle of the rays striking the panel. To check the output, simply disconnect the solar panel leads from the control board and connect them directly to a DC voltmeter. In bright sunlight the panel output should read at least 18-22 volts DC.
STEP 3: ATTACHING WIRE TO CONTROL BOARD Make sure control board switch is in the OFF position. Feed the free end of the solar panel wires into the control box and attach them to the appropriate terminals on the control board. Connecting the black wire to solar terminal () and the red wire to solar (+). Improper installation of these wires will damage the opener’s control board.
Maximum of 40-Watts (combined) when connecting two or more solar panels.
NOTE: INSTALLING TWO OR MORE SOLAR PANELS TO THE CONTROL PANEL you should connect the panels in parallel as shown in the diagram below using weather resistant wire nuts. Do NOT connect the solar panels in series. Please also consider the following details:
— Two or more solar panels may be wired in parallel, but the combined power output of solar panels must not exceed 40-Watts.
— Maximum wire length between the control board and solar panels is no more than 100 feet.
BLACK RED
NEVER USE THE SOLAR PANEL AND THE AC TRANSFORMER AT THE SAME TIME!
It will damage the control board and void your warranty.
WARRANTY:
Connect panels in parallel. If using wire nuts, must use
weatherproof wire nuts.
GHOST CONTROLS® Solar Panels are warrantied for 18 months with proof of purchase when you register your solar panel on ghostcontrols.com/pages/product-registration. See warranty terms on ghostcontrols.com/pages/warranty.
For more information on GHOST CONTROLS® Automatic Gate Openers and Accessories please visit our website at www.ghostcontrols.com.
WARNING: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer. For more information, go to www.P65Warnings.ca.gov
AXDPIM | REV 0523 ©2023 GHOST CONTROLS®
PANEL SOLAR
INSTRUCCIONES
NOTA:
WARNING:
DO NOT connect solar panel directly to a battery!
ANTES DE INSTALAR EL PANEL SOLAR DEBE ESTAR UBICADO EN UNA ÁREA ABIERTA QUE RECIBA PLENO SOL DURANTE AL MENOS 8 HORAS AL DÍA.
CONSEJOS PARA INSTALACIONES SOLARES:
1. Los paneles solares deben montarse de manera que el crecimiento del follaje, como las hojas de los árboles, las ramas de los árboles o las malezas, no cubran el panel solar y den sombra en ningún momento del día, independientemente de la época del año.
2. Los paneles solares deben limpiarse periódicamente para eliminar la nieve, suciedad, moho acumulado que deteriora el rendimiento. 3. Si este panel solar se va a usar con un sistema de apertura de portones GHOST CONTROLS®. El indicador LED (mostrado) en el
panel de control del sistema GHOST CONTROLS® lo ayudará a alinear el panel para un rendimiento de carga óptimo. 4. Cuanto más rápido parpadee la luz de estado de energía, mejor será la carga. Si tiene una luz de estado sólida, su rendimiento solar también es bueno. 5. Una luz que parpadea lentamente significa que se debe girar demasiada cortina o panel para obtener un mejor rendimiento de carga. 6. Coloque el panel orientado en el camino del sol. Muchos teléfonos inteligentes tienen una brújula magnética para ayudarle. 7. Monte el panel utilizando el tubo curvo provisto para mantener el ángulo apropiado al sol.
INSTALANDO TU PANEL SOLAR:
PASO 1: COLOCACIÓN DEL PANEL PARA TUBER Coloque el tubo curvo (D) y coloque dos abrazaderas de tubo (C) sobre el tubo curvo. Enhebrar el 4 pernos M8 (F) a través de la parte superior e inferior. Canales del panel solar como se muestra. Seguro los pernos M8 (F) con las tuercas M8 (E). PASO 2: ASEGURAR EL PANEL AL POSTE
E C F
D E
C F
A. Determine el lugar de instalación del panel solar.
B. Fije el ensamblaje del panel solar a un poste o cerca de madera usando dos abrazaderas de tubería (C) y cuatro pernos de retraso (B) como se muestra en la ilustración de la derecha. Si tu poste de la cerca es de metal, necesitará material alternativo que no se proporciona (por ejemplo, abrazaderas en U o tornillos de lámina metálica).
*Si el panel solar debe colocarse a más de 10 pies de la caja de control para recibir la luz solar directa, puede usar hasta 100 pies de multifilares, GHOST CONTROLS® calibre 16, entierro directo, cable de bajo voltaje (AXLV). NUNCA use un cable de núcleo sólido.
EL PANEL NECESITA CARA AL SUR Y OBTENGA 8 HORAS DE DOM
C B
C B
IMPORTANT:
— Consulte el mapa solar y la tabla para asegurarse de que tiene la cantidad correcta de energía solar requisito para su área.
El requisito mínimo de batería para la energía solar son dos baterías de 12 V y 7 amperios por hora (ABBT2) o una batería marina de ciclo profundo de 12V.
Para proporcionar empalmes seguros y resistentes a la humedad para los paneles solares, use un empalme de entierro directo kit para TODOS los empalmes. Estos kits de empalmes se pueden encontrar en las tiendas de hardware y suministros eléctricos.
— Para una eficiencia óptima, limpie la cara del panel con frecuencia con un paño suave y húmedo. — La energia producida del panel solar es variable durante el día dependiendo de la intensidad del sol y
el ángulo de los rayos que golpean el panel. Para verificar la salida, simplemente desconecte los cables del panel solar de la placa de control y conéctelos directamente a un voltímetro de CC. En luz solar brillante, la salida del panel debe leer al menos 18-22 voltios de CC.
¿Necesita agregar energía solar a su abrepuertas?
Use este mapa solar y tabla para ayudarlo a decidir cuánta energía solar necesita
* Se necesita un máximo de 6 horas de luz solar directa para llegar al panel solar
PASO 3: CONECTAR EL ALAMBRE A LA TARJETA DE CONTROL Asegúrese de que el interruptor del tablero de control esté en la posición APAGADO. Introduzca el extremo libre de los cables del panel solar en la caja de control y conéctelos a los terminales apropiados en el tablero de control. Conectando el cable negro al terminal solar () y el cable rojo al solar (+). La instalación incorrecta de estos cables dañará el tablero de control del abrepuertas. NOTA: INSTALACIÓN DE DOS O MÁS PANELES SOLARES EN EL PANEL DE CONTROL debe conectar los paneles en paralelo como se muestra en el siguiente diagrama usando tuercas para alambre resistentes a la intemperie. NO conecte los paneles solares en serie. Por favor, considere también los siguientes detalles:
— Se pueden conectar dos o más paneles solares en paralelo, pero la potencia de salida combinada de los paneles solares no debe exceder los 40 vatios..
— La longitud máxima del cable entre el tablero de control y los paneles solares no supera los 100 pies.
NEGRA ROJA
Máximo de 40 vatios (combinados) cuando Conexión de dos o más paneles solares.
¡NUNCA UTILICE EL PANEL SOLAR Y EL TRANSFORMADOR DE CA AL MISMO TIEMPO!
Dañará el tablero de control y anulará la garantía.
Conecte los paneles en paralelo. Si usa tuercas para cable, debe usar tuercas de alambre resistentes a la intemperie.
GARANTÍA: Los paneles solares GHOST CONTROLS® tienen una garantía de 18 meses con el comprobante de compra cuando registra su panel solar en https://ghostcontrols.com/pages/product-registration. Consulte los términos de la garantía en ghostcontrols.com/pages/warranty.
Para obtener más información sobre los abridores automáticos de portones y accesorios GHOST CONTROLS®, visite nuestro sitio web en www.ghostcontrols.com.
ADVERTENCIA: Este producto puede exponerlo a productos químicos, incluido el plomo, que el estado de California reconoce como causante de cáncer. Para obtener más información, visite www.P65Warnings.ca.govon
AXDPIM | REV 0523 ©2023 GHOST CONTROLS®