Pergo Lf001078p Xp+ 6.14 In. W Catalina Acacia Waterproof Laminate Wood Flooring Instruction Manual

LF001078P XP+ 6.14 in. W Catalina Acacia Waterproof Laminate Wood Flooring

PERGO XP+

PERGO XP+ is a laminate floor covering made in the USA. It is a
durable floor covering not intended as structural material.
Laminate requires a clean, dry, and secure subfloor that meets
building codes. The following tools and supplies are required for
installation:

  • Common tools
  • Wood glue
  • Carbide 40T blade
  • S5 spacers
  • Laminate floor tapping block and 5mm (3/16) spacers
  • Finishing putty
  • Silicone caulk (100% silicone sealant)
  • Felt furniture pads
  • PE foam backer rod
  • Moisture meter (non-destructive moisture meter and finishing
    moisture meter)
  • Ground
  • 6 mil (0.15 mm) virgin polyethylene vapor barrier

Site Requirements

Laminate requires a subfloor that is clean, dry, and secure. The
subfloor must meet building codes. A 6 mil (0.15 mm) virgin
polyethylene vapor barrier is required. The following site and
material preparation is required:

  1. Remove carpet and padding. Do not remove products unless they
    are asbestos-free.
  2. Undercut door frame and wallbase. Slide the flooring at least
    1/4 underneath the door frame and wallbase. Also leave a concealed
    3/8 minimum expansion space under each.
  3. Remove bumps or peaks in the subfloor and fill depressions with
    floor leveling compound to ensure no more than 3/16 unevenness per
    10-foot span.
  4. Clean debris from subfloor before installation.
  5. For concrete subfloors, install vapor barrier with overlapped
    seams of 8 or more.
  6. For planks without attached underlayment, install over single
    layer of underlayment appropriate for laminate floors. For planks
    with attached underlayment, it is acceptable to install Pergo
    FloorMateTM underlayment prior to flooring installation if desired.
    Make sure to follow the Pergo FloorMateTM installation
    instructions.

Flooring Installation

  1. Inspect each plank. Floor should be installed blending planks
    from several cartons at the same time to ensure good color and
    shade mixture throughout the installation.
  2. For the first row along straight walls, remove the tongue on
    all long side joints and on the short side of the 1st plank
    only.

PERGO XP+ Install Instructions
Tools Required for Installation Common Tools
Wood Glue
Carbide 40T Blade

XP+ TM

Other Tools and Supplies

S5 pmamcers 5Smpmacers
Laminate floor tapping block and 5mm (3/16″) spacers

ALLY DEVELO

RING SPECI

Finishing Putty
PED FOR LA CPCPRROOSSEEYMYMMMSSPITPITUEUOEOMMMMNNEENNTT MADE IN THE USA 1 FL OZ (33.5ml)

MINATE FLOO

23 1
0

dlfwej dtra

4

djflsv

5

6

50 100 150 200

0

Concrete

250

Encounter

Plus

dlfwe vtra alskdjf vmwjc

Moisture Meter

ON Non Destructive Moisture

Finishing Moisture

Putty

Meter

SILICONE CAULK
SILICONE CAULK

SICLIACUOLNKE
100% Silicone Sealant

Felt furniture pads

PE Foam Backer Rod

Job Site

10′ (3 m)

> 5″ (130 mm)

> 8″ (200 mm)

ground
6 mil (0.15 mm) virgin polyethelene vapor barrier

Site Requirements
Laminate is a durable floor covering, not intended as structural material. Laminate requires a clean, dry, secure subfloor that meets building codes.
The following requirements are not intended to supersede federal, state or local building codes, but as with many other interior finish products, may require modifying existing structural components for successful installation. Owner assumes responsibility for compliance with all building codes.
Laminate floor is suitable for use in climate controlled (35-65% RH and 6085° F) indoor installations only and should not be installed over any floor with a sump pump or in a room with a floor drain. Laminate floor can be installed above, on or below grade.
A moisture test is strongly recommended to determine if high moisture exists in the subfloor. When using a calcium chloride moisture test for concrete subfloors (ASTM F1869), values must be 5 lbs/1000ft²/24-hr or <80% RH with an in-situ probe (ASTM F2170). Moisture readings of wood subfloors must be 12%.
Acceptable job site conditions, including relative humidity and subfloor moisture conditions, must be maintained throughout the lifetime of the flooring.
Laminate flooring is installed as a floating floor and requires the use of T-moldings in doorways 4 ft (1.22m) or less and in rooms 40 feet (12.2 m) or larger in length or width. Floor movement must not be constrained by glue, nails, screws, hardware or other fixed obstructions.
This product must be installed in accordance with these installation instructions.

For more information, call 1-800-33-PERGO

1

2022_06_X2_UNI

PERGO XP+ Install Instructions

Site and Material Preparation

A

B

C

Door Frame

Wallbase Casing

Cutting Line

1 inch

D

E

F

48 hours

%
60° ­ 85° F 35% ­ 65% RH

G
> 8″ (200 mm)

6 mil (0.15 mm) virgin polyethelene vapor barrier

subfloor

Site and Material Preparation
A.) Remove carpet and padding. Also remove any wood flooring installed on concrete. Do not remove products unless they are asbestos-free.
B.) Undercut door frame and wallbase. Slide the flooring at least 1/4″ underneath the door frame and wallbase. Also leave a concealed 3/8″ minimum expansion space under each.
C.) Remove bumps or peaks in subfloor and fill depressions with floor leveling compound to ensure no more than 3/16″ unevenness per 10-foot span.
D.) Acclimate unopened product before installation. If there is no time for acclimation, there should be no more than a difference of 25° F and 20% relative humidity between the stocking/transportation environment of the
flooring and the final installation environment of the flooring. E.) Clean debris from subfloor before installation. F.) For concrete subfloors, install vapor barrier with overlapped seams of 8″ or more. G.) For planks without attached underlayment, install over single layer of underlayment appropriate for laminate
floors. For planks with attached underlayment, it is acceptable to install Pergo FloorMateTM underlayment prior to flooring installation if desired. Make sure to follow the Pergo FloorMateTM installation instructions, taking special care to seal all foam edges with sealing tape and repair all rips and perforations in the underlayment vapor barrier prior to flooring installation. A separate vapor barrier should not be used in conjunction with Pergo FloorMateTM.

2

2022_06_X2_UNI

PERGO XP+ Install Instructions

1

2

3

4

5

Left

Right

6

1

2

4

5

6

3 6

5

5

6

> 12 in

7

8

9

1

3

2

4

10

11

12

13

14

15

16

17

3

2022_06_X2_UNI

PERGO XP+ Install Instructions

18

19

Molding

Silicone sealant

Molding

PE foam backer rod Silicone sealant

PE foam backer rod

Silicone sealant

Flooring Installation

1. Inspect each plank. Floor should be installed blending planks from several cartons at the same time to ensure good color and shade mixture throughout the installation.

2. For the first row along straight walls, remove the tongue on all long side joints and on the short side of the 1st plank only.

3. For uneven walls, trace contour on tongue-side of plank and cut. 4. Assemble the first row tongue side toward wall. Insert the end tongue into the end groove and rotate downward to
assemble. Keep the planks aligned and the joints closed.

5. Two spacers thick side to thick side = 3/8″. 6. Provide a 3/8″ space for expansion on all sides. First piece must be at least 8″ long. Start new rows with pieces
trimmed from previous row. Ensure at least a 12″ end joint offset.

7. At a slight angle, insert the tongue of plank 2 into the groove of plank 1 until the laminate edges meet, and then rotate down until the joints lock.

8. Join the short end of the plank first. There will be a gap on the long side joints when the plank is rotated down. 9. Raise the outside edge of the plank upward approximately 1″. Maintain this angle as you push the plank in until
the laminate edges meet. Rotate downward on the plank until the joint locks. Repeat these steps to complete the

installation. Installation Tip: Place a carton of planks across the end of the row being installed to keep installed

planks in place during installation. 10. Alternate Tap Method: Align the tongues into the grooves of the long and short sides of the planks. Install the long
side first by placing a tapping block no closer than 8″ from either end and tap lightly along the long side until the joint

is closed tightly. Then tap the end using the tapping block into a locked position. Note: Uneven tapping or use of

excessive force may damage the joint. 11. Ensure there will be a 3/8″ gap (after the joint is closed) to the wall for expansion. 12. For the last row, align the plank to be used on top of the 2nd to last row. Using a full width plank as a spacer, trace wall
contour and cut plank.

13. For the last row, install the long side tongue into the groove with the end joint aligned. Using a pull bar and hammer, work evenly along the length of the plank and lightly tap the joint closed.

14. After tapping the long side joint closed, tap the short side closed, using a tapping block or a pull bar.

Installation Under Doorway Frames

15. Slide plank under pre-cut door frame. 16. Tap the long side joint closed first. Then tap the end joint closed.

Installation Around Fixed Objects (such as Pipes)

17. Allow 3/8″ expansion space around pipes or other fixed objects.

Finishing the Installation

18. Remove all spacers. 19. Create a watertight seal by applying flexible 100% silicone sealant to the entire perimeter of the installation. DO NOT
use acrylic sealant. · First fill all expansion spaces with 3/8″ compressible PE foam backer rod and cover with silicone sealant. · Prior to installing the moldings, apply silicone sealant to the portion of the molding or transition that will contact

directly with the laminate flooring surface. · Install moldings and immediately wipe away any excess silicone sealant. · Apply silicone sealant at connections to doorframes or any other fixed objects.

4

2022_06_X2_UNI

PERGO XP+ Install Instructions

A

B

C

Care and Cleaning A) Place felt floor protectors under legs of moveable furniture. Chair casters should be rubber ­ not plastic or metal.
B) Place walk-off mats at entrances.
C) Dust mop as primary cleaning method. Occasionally wet mop with water only, using a well wrung out mop; DO NOT pour liquid directly on floor or use an excessively wet mop that will puddle or leave moisture standing on the floor. If needed, use a solution of 1 cup of vinegar per gallon of water OR 1/3 cup non-sudsing ammonia per gallon of water. DO NOT use detergents, abrasive cleaners, soaps, waxes or polishes. Use correct hard surface vacuum tools. DO NOT use rotating beater bars, floor scrubbers, steamers, jet mops or similar products. Wipe up spills immediately. DO NOT allow topical moisture to remain on the floor longer than the time specified in the product warranty.

5

2022_06_X2_UNI

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals