G21 Gah 1085 Steel Base Instructions

G21 Gah 1085 Steel Base Instructions

G21 logoGAH 1085 Steel Base
Instructions

G21 GAH 1085 Steel Base fig 7

Steel BASE  GAH 1085

GAH 1085 Steel Base

Thank you for purchasing our product.
Before use, please read these instructions carefully.G21 GAH 1085 Steel Base fig 6

Základna GAH 1085 

NameQty
V-A18
V-A38
V-A44
40

G21 GAH 1085 Steel Base fig 5

Installation

G21 GAH 1085 Steel Base fig 4

Kit before you begin / Site preparation

  1. Befor beginning construction, check local building codes regarding footings, location and other requirements.
  2. Follow all directions and dimensions carefully.
  3. Follow the step sequence carefully for correct results.
  4. Be sure all the parts it together properly before proceeding.
  5. SAFETY FIRST: Care must be taken when handling various pieces of your kit because some contain sharp edges. Wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your kit.
  6. BASIC TOOLS: Screwdriver, pliers, work gloves, tape measure, level and a spade or shovel.
  7. GROUND MUST BE LEVEL: Be sure loor frames lie lat on ground. To prepare construction, remove sod and other bumpiness. Level the high spots with lat shovel and tamp construction down.
  8. Separate contents of the carton by the part number while reviewing parts list. Check to be sure that you have all the necessary parts for your kit.

G21 GAH 1085 Steel Base fig 3Images used in this manual are for illustrational purposes only and may differ from the actual product.G21 GAH 1085 Steel Base fig 2G21 GAH 1085 Steel Base fig 1G21 logo

References

Documents / Resouces

Download manual
Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.


Related Manuals