SF-ALLP50-BK Boyd Build-Out Kit
Product Information
Product Name: Boyd Build-Out Kit
Model: SF-ALLP50-BK
Kit Components:
| ITEM | DESCRIPTION | QUANTITY |
|---|---|---|
| A | Front Face Mantel Shelf | 1 |
| B | Right Side | 1 |
| C | Left Side | 1 |
| D | Right Inner Panel | 1 |
| E | Left Inner Panel | 1 |
| F | Inner Top | 1 |
| G | Top Ledger | 1 |
| H | Lower Shelf | 1 |
| I | Lower Ledger | 1 |
Tools and Supplies Needed:
| ITEM | DESCRIPTION | QUANTITY |
|---|---|---|
| K | Mantel Blocks | 2 |
| L | Toe Kick Front | 1 |
| M | Toe Kick Sides | 2 |
| N | Shelf Support Blocks | 3 |
| O | Wall Cleat | 2 |
Fasteners:
| ITEM | DESCRIPTION | QUANTITY |
|---|---|---|
| P | M6- CAM PIN | 22 |
| Q | CAM LOCK FASTENER | 22 |
| R | M6- BARREL NUT | 12 |
| S | M6 X 15 MACHINE SCREW | 16 |
| T | M6 X 30 MACHINE SCREW | 3 |
| U | M6 X 50 MACHINE SCREW | 12 |
| V | L-BRACKET | 8 |
| W | CONSTRUCTION SCREW | 8 |
| X | M6 X 100 – 10MM HEX HEAD LAG SCREW | 6 |
Product Dimensions:
| A | B | C* | D | E | F | G | H | I | J | |
|---|---|---|---|---|---|---|---|---|---|---|
| Model Modern Farmhouse | 78-1/8 in. | 37-1/4 in. | 1-1/2 – 5-1/2 in. | 72-1/2 in. | 74-1/4 in. | 51 in. | 19-1/2 in. | 8 in. | 6-1/16 in. | 26-3/4 in. |
| Model Ready-to-Finish | 67-3/4 in. | 34-1/2 in. | 1-1/2 – 5-1/2 in. | 62-3/4 in. | 64-3/4 in. | 51 in. | 19-1/2 in. | 7-1/2 in. | 6-1/16 in. | 26-3/4 in. |
* Baseboard height if using toe kick.
Outlet Location:
Note: Make sure your electrical receptacles are located in the
highlighted areas.
| Model | A | B | C | D | E |
|---|---|---|---|---|---|
| Modern Farmhouse | 10-1/8 in. | 26-1/4 in. | 26-1/4 in. | 33 in. | 2-1/4 in. |
| Ready-to-Finish | 5-1/2 in. | 26-1/4 in. | 26-1/4 in. | 33 in. | 1/2 in. |
Product Usage Instructions
- Before you start, ensure that the walls and floor in the area
of the installation are clean, plumb, and level. If there are any
major deviations, they should be remedied before installing the
Boyd Build-Out Kit. - Ensure you have all the necessary tools and supplies mentioned
in the user manual. - If you are using a toe kick, adjust the lower cleat to the
baseboard height as mentioned in the product dimensions. - If you need to conceal an electrical receptacle, refer to
Figure 3 for outlet location guidelines. - Use a stud finder to mark the stud locations in the intended
installation location. - Remove the Build-out Kit parts and hardware from the packaging,
ensuring not to damage the product while cutting the packaging
material. - Follow the instructions provided with Figure 1 and Figure 2 for
using the Cam Pin and Cam Lock Fastener to assemble the kit. Make
sure to lock the Cam Pin securely but avoid overtightening. - Review the product dimensions on pages 3 and 4 to confirm fit
and electrical receptacle location during assembly. - During assembly, use a protective surface as an underlayment to
avoid damaging the product or finished flooring.
Boyd Build-Out Kit
BOK-MF-ALLP50, BOK-RTF-ALLP50
Model: SF-ALLP50-BK
– Instructions –
NOTICE: Before you start, the walls and floor in the area of the installation should be clean, plumb and level. Any major deviation should be remedied before installing the Boyd Build-Out Kit.
Kit Components
ITEM A B C D E F G H I J
DESCRIPTION Front Face Mantel Shelf Right Side Left Side Right Inner Panel Left Inner Panel Inner Top Top Ledger Lower Shelf Lower Ledger
QUANTITY 1 1 1 1 1 1 1 1 1 1
Tools and Supplies Needed
· Phillips Screwdriver (No. 3 preferred) · Drill · 5/32″ or 4 mm Drill Bit · 10 mm Socket or Nut Driver · Level
· Stud Finder
ITEM
DESCRIPTION
K Mantel Blocks
L Toe Kick Front M Toe Kick Sides N Shelf Support Blocks
O Wall Cleat
QUANTITY 2 1 2 3 2
B
G
D F
K H
I
E
O
J
N
A
C
M L
* BOK-MF-ALLP50, Modern Farmhouse, model shown.
Figure 1
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
1
Fasteners
ITEM
DESCRIPTION
P M6- CAM PIN
Q CAM LOCK FASTENER
R M6- BARREL NUT
S M6 X 15 MACHINE SCREW
T M6 X 30 MACHINE SCREW
U M6 X 50 MACHINE SCREW
V L-BRACKET
W CONSTRUCTION SCREW
X
M6 X 100 – 10MM HEX HEAD LAG SCREW
QUANTITY 22 22 12 16 3 12 8 8
6
P
Q
R
S
T
U
V
W
X
How to use Cam Pin and Cam Lock Fastener:
Step 1
TURN THE CAM PIN UNTIL THE SHOULDER IS FLUSH WITH THE SURFACE OF THE BOARD.
Note: Following Instructions apply to both the Cam Lock Fastener and Barrel Nut.
Step 2
ARROW
CAM LOCK FASTENER
PUSH THE CAM LOCK FASTENER INTO PART. THE ARROW OF THE CAM LOCK FASTENER MUST POINT TO PRE-DRILLED HOLE ON THE EDGE OF THE BOARD.
PRE-DRILLED HOLE
Step 3
INSERT THE CAM PIN INTO THE CAM LOCK FASTENER.
Starting Position
Step 4
USING A PHILLIPS SCREWDRIVER, ROTATE THE CAM LOCK FASTENER CLOCKWISE TO LOCK THE CAM PIN.
Locked Position
Note: Do not overtighten.
2
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
Product Dimensions
A
H
I
F G
K
B
J
*C D E
* Baseboard height if using toe kick.
Model
Modern Farmhouse in. BOK-MF-ALLP50 mm
Ready-to-Finish in. BOK-RTF-ALLP50 mm
A 78-1/8 1984 67-3/4 1721
B 37-1/4
946 34-1/2
876
*C 1-1/2 – 5-1/2
38 – 140 1-1/2 – 5-1/2
38 – 140
D 72-1/2 1918 62-3/4 1594
E 74-1/4 1886 64-3/4 1645
L
F 51 1295 51 1295
Model
Modern Farmhouse in. BOK-MF-ALLP50 mm
Ready-to-Finish in. BOK-RTF-ALLP50 mm
G 19-1/2
495 19-1/2
495
Figure 2
H 8 203 7-1/2 191
I 6-1/16
154 6-1/16
154
J 26-3/4
679 26-3/4
679
K 32-3/8
822 31-1/4
794
L 5-1/8 130 3-1/4
83
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
3
Outlet Location
Note: Make sure your electrical receptacles are located in the highlighted areas.
A
B
C
D
E
LOWER CLEAT TO BASEBOARD IF USING OPTIONAL TOE KICK
Model
A
B
C
D
Modern Farmhouse in. 10-1/8
26-1/4
26-1/4
33
BOK-MF-ALLP50 mm
257
667
667
838
Ready-to-Finish in.
5
26-1/4
26-1/4
33
BOK-RTF-ALLP50 mm
127
667
667
838
E 2-1/4
57 1/2 13
Figure 3
Preparation
Ensure the Wall at the intended installation location is flat. Review Dimensions on Pages 3 and 4 to confirm fit and electrical receptacle location.
Ensure you have enough space to complete the Buildout Kit assembly. A protective surface should be used as an underlayment during assembly to avoid damaging the product or finished flooring.
Before you begin, use a stud finder to mark the stud locations in the intended installation location.
If attempting to conceal an electrical receptacle refer to Figure 3.
Remove the Build-out Kit parts and hardware from the packaging.
WARNING: CUTTING PACKAGING MATERIAL COULD DAMAGE THE PRODUCT.
4
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
Refinishing (Optional)
Ready To Finish Model (BOK-RTF)
The Ready To Finish Model (BOK-RTF) Cabinet comes pre-primed ready to accept paint. The Ready To Finish mantel is unfinished and should be coated with the desired finishing material appropriate for a wood veneer.
Modern Farmhouse Model (BOK-MF)
The Modern Farmhouse Model (BOK-MF) Cabinet is finished with a white final coat. The Modern Farmhouse Mantel is pre-finished. If refinishing of the mantel is desired, the following steps are recommended prior to assembling the mantel:
· Properly cover any areas of work space that you do not want to be painted.
· Lightly scuff the existing finish with 320 grit sandpaper.
· Remove dust using lint free cloth.
· For best results, apply a base coat of spray paint primer to evenly cover the mantel.
· Wait the recommended amount of time per the paint and primer instructions, then apply a spray paint top coat in the color of choice to evenly cover the mantel.
· Apply additional top coats until desired coverage is achieved.
NOTICE:
· Follow all recommended guidelines for the materials you are using.
· Do not spray paint near the appliance.
· Do not spray paint while the appliance is operating.
· Always wear appropriate gloves, eye protection, clothing and a respirator or mask when painting.
· The room or area you are spraying must be well ventilated and must be properly masked in order to preventing overspray from covering woodwork, floors or furnishings.
Assembly
Step 1
· Locate part “A” and lay face down on a protective surface.
· Install 18 Cam Pins (P) in the location shown in Figure 1. Refer to Step 1 on page 2 and Figure 4.
P (x 18)
LEAVE THESE HOLES EMPTY
CABINET TOP
A
Figure 4
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
5
Step 2
· Install three (3) Cam Lock Fasteners (Q) into part “C” with the arrows in the orientation shown in Figure 5.
· Repeat this step for part “D”.
Q (x 3 per part)
NOTE THE DIRECTION OF THIS ARROW
Step 5
· Install four (4) (V) L-Brackets using eight (8) M6 X 15 screws (S) securing parts “C” and “D” to part “A”. See Figure 8.
V (x 4)
S (x 8)
CABINET TOP
(Q)
C
CAM LOCK
FASTENERS
Repeat for Part “D”
(V) L-BRACKET LOCATIONS
(S) MACHINE SCREWS
Figure 5
Step 3 · Align parts “C” and “D” onto the three (3) Cam Pins
installed on each side of part “A”. See Figure 6.
C
CABINET TOP
D
(P)
A
CAM PINS
Figure 6
Step 4
· With parts “C” and “D” installed on the Cam Pins, use a Phillips screwdriver to gently rotate the Cam Lock Fasteners 1/4 turn clockwise. Do not overtighten or over rotate, note the arrow orientation in Figure 7.
Starting Position
Locked Position
CABINET TOP
Figure 8
Step 6
· Install three (3) Cam Lock Fasteners (Q) into part “E” with the arrows in the orientation shown on page 2 and Figure 9. Repeat for part “F”.
Q (x 3)
NOTE THE DIRECTION OF THIS ARROW
E
(Q) CAM LOCK FASTENERS
Repeat for Part “F”
Figure 7 6
Figure 9 SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
Step 7 · Install three (3) Barrel Nuts (R) into part “E”. See
Figure 10. Repeat for part “F”.
R (x 3)
(R) BARREL NUTS
E
Repeat for Part “F”
Note the orientation of Cam Lock Fasteners and Barrel Nuts.
Step 10
· Install two (2) L-Brackets (V) using two (2) M6 X 15 screws (S) on part “G”. See Figure 13.
V (x 2)
S (x 2)
L-BRACKET ORIENTATION
L-BMGRAACCH(KVINE) TES(SSC) REWS
Figure 10
Step 8
· Align parts “E” and “F” onto the three (3) Cam Pins (P) installed on each side of part “A”. See Figure 11.
CABINET TOP
F
E A
(P) CAM PINS
Figure 13
Step 11 · Install three (3) Cam Lock Fasteners (Q) into part
“G” with the arrows in the orientation shown on page 2 and Figure 14.
Q (x 3)
(Q) CAM LOCK
FASTENERS
G
Figure 11
Step 9 · Turn each of the six (6) Cam Lock Fasteners (Q)
clockwise 1/4 turn shown in Figure 12 . Refer to Step 4.
CABINET TOP
(Q) CAM LOCK FASTENERS
Starting Position Figure 14
Figure 12
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
7
Step 12
· Align parts “G” onto the three (3) Cam Pins (P) installed on part “A”. See Figure 15.
CABINET TOP
G
A
(P) Cam Pins
Step 15
· Secure part “G” to parts “E” and “F” using M6 x 50 Machine Screws (U). See Figure 18.
CABINET TOP
(U) Machine Screws
U (x 2)
G
Figure 15
Step 13 · Turn each of the three (3) Cam Lock Fastener (Q)
clockwise 1/4 turn. Refer to Step 4 and Figure 16.
Q (x 3)
Figure 16
G
(Q) CAM LOCK FASTENERS
CABINET TOP
Figure 18
Step 16
· Secure part “H” to parts “E” and “F” using M6 x 50 Machine Screws (U). See Figure 19.
(U) Machine Screws
U (x 2)
H F
Step 14
· Secure part “G” to part “A” using two (2) M6 X 5 screws (S) and two (2) L-Brackets (V). See Figure 17.
CABINET TOP
(S) Machine Screws
S (x 2)
G
A
(V) L-Brackets
E
CABINET TOP
Figure 19
Step 17
· Install three (3) Barrel Nuts (R) into part “H” with the arrows in the orientation shown on page 2 and Figure 20.
(R) Barrel Nuts
R (x 3)
Figure 17 8
H
CABINET TOP Figure 20 SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
Step 18 · Secure part “H” to part “G” using three (3) M6 x 50
Machine Screws (U). See Figure 21.
U (x 3)
GH
(U) Machine Screws
Figure 21
CABINET TOP
Step 19
· Align part “I” onto the three (3) Cam Pins (P) installed in part “A”. See Figure 19.
I
A
(P) Cam Pins
CABINET TOP
Figure 22
Step 20 · Install three (3) Cam Lock Fasteners (Q) into part “I”
with the arrows in the orientation shown on page 2 and Figure 23. · Turn each of the three (3) (Q) Cam Lock Fasteners (Q) clockwise 1/4 turn. Refer to Step 4 and Figure 23.
Q (x 3)
I
A
Cam
(Q) Lock Fasteners
CABINET TOP Figure 23
Step 21
· Secure part “N” to part “I” using M6 x 30 Machine Screws (T). See Figure 24.
(T) Machine Screws
CABINET TOP
T (x 3)
A
Figure 24
(N) Shelf Support Blocks
Step 22
· Secure part “I” to parts “E” and “F” using two (2) M6 x 50 Machine Screws (U). See Figure 25.
U (x 2)
CABINET TOP
E
Figure 25
F
I
(U) Machine Screws
Step 23
· Install three (3) Barrel Nuts (R) into part “J” with the arrows in the orientation shown on page 2 and Figure 26.
(R) Barrel Nuts
R (x 3)
J
Figure 26
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
9
Step 24 · Secure part “J” to part “I” using three (3) M6 x 50
Machine Screws (U). See Figure 27.
U (x 3)
J
Machine Screws (U) CABINET TOP Figure 27
Step 25
· Secure part “K” (x 2) to part “B” using two (2) Construction Screws (W) on each side. See Figure 28.
CSoncrset(rwuWsct)ion
B
K (x 2)
W (x 4)
Figure 28
Step 26
· Install four (4) Cam Pins (P) onto part “L” in the locations shown in Figure 29. Refer to Step 1 on page 2.
(P)
L
Cam Pins
P (x4)
Figure 29
Step 27 · Install two (2) Cam Lock Fasteners (Q) into each
part “M” with the arrows in the orientation shown on page 2 and Figure 30. · Align left and right parts “M” onto the Cam Pins installed on part “L”. See Figure 30.
· Turn each of the four (4) Cam Lock Fasteners (Q) clockwise 1/4 turn. Refer to Step 4 and Figure 30.
Q (x 4)
M
L
Cam
(Q)
Lock Fasteners
Figure 30
Step 29
· Install two (2) L-Brackets (V) using two (2) M6 X 15 screws (S) on part “L”. Secure two (2) L-Brackets (V) using two (2) M6 X 15 screws (S) to part “M” on each side. See Figure 31.
S (x 4)
V (x 2)
(S)
SMcarcehwisne
(V)
L-Brackets
L
(M) (S)
SMcarcehwisne
Figure 31
10
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
Wall Cleat Installation:
The location of the wall cleats determine the final height and location of the build-out kit. Refer to product dimensions on page 3 and 4 to assist in locating the wall cleats.
Accommodating Baseboard Trim
If installing over an existing baseboard with the use of the toe kick, the lower wall cleat should be positioned 1/2 in.(BOK-RTF model) or 2-1/4 in. (BOK-MF model) above the baseboard. See Figure 32.
Locate and mark the location of the wall studs. Place the lower wall cleat against the wall and ensure it is level.
Warning: Use caution to avoid any in-wall utilities.
Noting the location of the studs, pre-drill (5/32) holes at three stud locations. Transfer the stud spacing marks to each cleat and pre-drill a 5/32 in. hole at three stud locations in the lower thicker section of each of the cleats.
With pilot holes drilled through position the lower cleat against the wall in its final location, using the drill bit transfer the pilot hole locations to the wall 5/32 in. Pilot holes should be drilled 2 in. into the wall. .
Use either a Phillips or 10 mm hex driver to secure the wall cleat to the wall to three (3) studs using three (3) M6x100 Lag Screws (X) into each cleat.
Repeat this process for the upper wall cleat. Locate it vertically aligned from the lower wall cleat with 26-3/4 in. between the bottom of the lower wall cleat and the bottom of the upper wall cleat.
Each Cleat should be installed using three (3) M6x100 lag screws (X).
Toe Kick Placement (Optional)
The optional floating toe kick is designed to accommodate a baseboard up to 5-1/2 in. tall and up to 3/4 in. thick.
If applicable, place the assembled toe kick against the wall / baseboard centering it with the desired final location of the build-out kit. The toe kick will be captured by the cabinet assembly without further fasteners once installed.
Hanging Cabinet Assembly
Place the main cabinet assembly of the Build-out Kit against the wall, centering it around the installed wall cleats. Slide the cabinet assembly down until the ledgers (parts H & J) are fully seated into the wall cleats. See Figure 32.
Note: Take special care not to scuff any existing wall paint as you slide the cabinet into the wall cleats. Avoid scuffing by placing painters tape on the wall in the exposed locations that the cabinet will make contact, behind the edges of the sides and area above the top wall cleat.
LOCATE AND MARK 3 STUD LOCATIONS
LEVEL
(O) Upper Wall Cleat
BASEBOARD
(O) Lower Wall Cleat
X (x 6)
Toe Kick
Figure 32
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23
PRE-DRILL Ø 5/32in [4mm] 2 in. [520mm] NO FASTENERS IN TOP SECTION OF WALL CLEAT
STUD
26-3/4 in. (679 mm)
11
Note: Depending on the outlet or hardwire location, the appliance wiring may need to be completed prior to installing the mantel shelf and appliance. The appliance power cord may be routed through the U-shaped notch on parts E or F of the cabinet assembly to access a outlet receptacle that is to be hidden behind the Buildout Kit.
Place the mantel shelf assembly (parts B & K) in place on top of the cabinet assembly. See Figure 30.
The mantel shelf may be secured with two (2) Construction screws (W) from the inside of the appliance cavity of the cabinet. There are two pilot holes located in the inner top (part “G”). See Figure 31.
Appliance Installation
Follow the appliance installation instructions included with the appliance to mount the appliance into the cavity of the build-out kit cabinet. Once the appliance is wired, level and plum with the cabinet, secure it via the appliance mounting locations with the four (4) construction screws (W) included with the appliance. See Figure 32.
Figure 30
W (x 2)
(W)
Construction Screws
Figure 31
FOUR (4) MOUNTING SCREWS (PROVIDED WITH APPLIANCE)
Figure 32
Service and Maintenance
To clean build-out kit surface, use clean damp cloth and wipe dry.
Replacement Parts
DESCRIPTION KIT SKU
REPLACEMENT PART
Mantel Shelf (B)
BOK-MF-ALLP50 BOK-MF-MANTEL BOK-RTF-ALLP50 BOK-RTF-MANTEL
BOK-MF-ALLP50 Hardware Kit
BOK-RTF-ALLP50
BOK-HRDW
Mantel Sides BOK-MF-ALLP50 BOK-MF-SIDES
(D, C)
BOK-RTF-ALLP50 BOK-RTF-SIDES
SimpliFire, a brand of Hearth & Home Technologies 7571 215th Street West, Lakeville, MN 55044
www.hearthnhome.com
12
SimpliFire · Boyd Build-Out Kit Instruction Manual · 2044-922 · 2/23


















