Smart Scale US20HRC
USER MANUAL
First use
To activate and turn on the scale for the first time, insert a pin into the RESET hole next to the power connector.
Weighing without the application
After activating the scale, your scale is ready to use. Without downloading the application, the scale can be used stand-alone as a regular digital weight scale.
Weighing procedure
- Step onto the scale to turn it on.
- Then step off the scale to let the Scale calibrate.CAL appears on the display.
- After 00 is displayed, step on the scale again.
- Keep standing on the scale. The measurement is completed after the measured value flashes twice.
- The display shows the detected weight, BMI, body fat, and heart rate.
- You can see other measured body parameters in the application.

Use the scale only with dry feet and barefoot. Body parameters cannot be measured over socks or with wet feet.
U-Scale application
With the U-Scale application, you have access to all measured data and you can easily monitor your weight and other parameters.
The UMAX Smart Scale US20HRC supports Bluetooth and WiFi connections. You must first connect the application to the scale via Bluetooth, and if you have a secure WiFi network, we also recommend setting up a WiFi connection.
You can find the U-Scale app in the Google Play Store (Android version) and the App Store (iOS version).
http://www.yolanda.hk/mobile/apps/os_down?os=U-scale
After installing the application, create your account and fill in your personal information. Gender, date of birth, and height must be filled incorrectly, these data are used to calculate somebody parameters.
Athlete mode – for those who have a muscular body and exercise intensively for more than 12 hours a week and whose resting heart rate is less than 60 beats per minute.
Bluetooth connection
After creating a new profile, set up the Bluetooth connection in the application.
Activate Bluetooth on your phone. If you’re using Android, also activate Location.
Step on the scale to switch io on, then step off the scale and wait until CAL and 00 appear on the display. Then step on the scale.
Icon of US20HRC is displayed in the application. Click on it.
Stay on the scale until the connection is completed.
After completing the Bluetooth connection, the WiFi connection option is displayed. You can set up a WiFi connection now or skip and set it up later.
If you have skipped Bluetooth set up after creating a user profile, you can set it up by clicking + on the main application page, selecting Device Management, and clicking +.
WiFi connection
Connection via WiFi is not required for the functionality of the scale, all measured data are also transmitted via Bluetooth.
If you have secure WiFi, we recommend setting up a WiFi connection, which has several advantages:
· WiFi range is greater than Bluetooth
· The measured data are automatically uploaded to the server via WiFi and it is not necessary to use the phone with the application during weighing You must first set up the scale via Bluetooth, and then you can set up a WiFi connection.
The scale supports connection via WiFi networks of 2.4GHz type. If you have a phone connected to a 5GHz network, connect it to a 2.4GHz network first. After completing the connection, you can reconnect your phone to the 5GHz network.
When the Bluetooth connection is completed, the WiFi connection setup option is automatically displayed.
Enter the password for your WiFi network. Wait for the scale to connect to your WiFi network. During the setup, do not turn off the application, wait for the connection to complete.
When done, the scale is connected to your WiFi network.
You do not have to use the phone and the application during weighing, the measured values will be sent to the server and will be automatically displayed in the application.
If you skipped the WiFi settings during the initial setup, you can set it later by clicking on the + on the main page of the application, selecting Device Management, and clicking on US20HRC. 
Measurement (Bluetooth)
If you have the U-Scale application running and Bluetooth turned on in your phone during measurement, the measured data will be sent directly to the phone via Bluetooth.
If you have switched off Bluetooth or the phone is not within range of the scale, the Bluetooth connection will not be established. If you have set up a WIFI connection, the measured data will be sent via WIFI.
If the WIFI connection is not set, the measured data will be stored in the scale and sent to the phone via Bluetooth next time.
Measurement (WiFi)
If you don’t have the U-Scale application open or have Bluetooth switched off during weighing, the measured data will be sent via WIFI to the server and downloaded from the server to the application.
Progress chart
In the application, click on Tracking to display the measured values on a chart. You can scroll the chart to view previous data, change the time period, and the body parameter that is displayed.
Calendar
All measured values are displayed in the calendar. Click on the Tracking, then on the clock icon in the upper right corner. You can use the arrows to switch between the months, and after clicking on the day, you will see all the measurements on that day.
Calendar – delete data
You can delete the measured values manually. Click Select Data in the upper right corner and select the measurement you want to delete. You can select several measurements on different days. Then click on the trash can icon to delete.
Calendar – data sharing
You can send the measured values by email or through another application. Select the measurement you want to share and click the arrow icon.

Calendar – data comparison
You can easily compare the measured values. Click Select Data in the upper right corner and select the measurement you want to compare. Then click the Comparison button.
Comparison of data on the main page
The main page shows a comparison of weight, BMI, and body fat between the first and last weighing.
If you want, you can set a comparison against another measurement.
- Click on the data comparison area.
- On the calendar, select the measurement you want to compare.
- The main page will now display a comparison of the last weighing with the selected weighing.

Add users
You can add other users in the application and monitor their measured values. Click My Account, and Add a member.
Select the type of user you want to add:
Add Measurement User – a user in the same household with whom you share the same scale. Fill in the user information as if you were creating your account. The scale automatically assigns the measured data to the correct local user.
Add Friends – a remote user, for example, a friend or nutritionist. Enter the email account that the user uses to log in to U-Scale. The remote user must confirm your connection request in their application. After linking, both accounts will see the measured values and the history of values.
Deleting users
To delete a user, swipe left on the username and click Delete.
Data assignment
The application automatically assigns the measured data to the correct user. If the measured data is very different from the previous ones, you must manually assign the measured data to the correct user or delete it.
Settings
Click My Account – Settings to see the application settings.
Here you can:
– change the color of the application
– set a goal for weight and body fat
– change units
– set the sound when weighing
– set up links with Google Fit, Fitbit, Apple Health
– set weighing alerts
– set PIN
– change the language of the application
– delete account
– log out
– and other
Linking with Google Fit
You can link the U-Scale application to Google Fit and synchronize the measured weight with the Google Fit application.
Click My Account – Settings – Google Fit and click the button to turn on sync.
Linking with Apple Health
On iPhone, you can link the U-Scale application to Apple Health and synchronize measured weight and other parameters.
Click My Account – Settings – Apple Health and click the button to turn on sync.
Charging
If Lo appears on the display, charge the scale. Connect the charging cable (USB Type-C) to the scale and connect the other end to the phone’s USB charger (5V 200mA).
A red battery icon appears on the display during charging.
When charging is complete, a green battery icon appears on the display.
Safety
- Do not use the scale if you have a pacemaker, artificial lungs, an ECG, or any other internal medical device.
- All data should be used as a reference and not as a medical examination.
- The scale is not intended for diagnosing a medical condition. Talk to your doctor before making changes to your diet, exercise plan, or physical activity.
- Check the scale before each use. If the scale is damaged, do not use it.
- The glass surface of the scale is slippery when wet. Make sure that the scale and your feet are dry.
Use and Care
- This scale is not intended for commercial use.
- To weigh safely and accurately, stand on the scale with your feet shoulder-width apart.
- Do not throw anything on the scale.
- Do not stand on the edges of the scale.
- Do not jump on the scale.
- Do not stand on the scale for a long time.
- Do not store or place it near heat sources or in a humid environment.
- Handle the scale carefully.
- Clean the scale with a damp and dry cloth and make sure that no water or other liquid gets inside the scale.
- Do not use chemical or abrasive cleaners to clean the scale.
- Keep the scale in a cool environment with dry air.
- Always keep the scale in a horizontal position, do not store it vertically.
- If the scale does not switch on or an error appears on the display, reset the scale by inserting a pin into the reset hole.
- Do not overload the scale.
- Do not put it in water, in the bathroom or in any other humid environment.
Technical support / Service center / Manufacturer
+420 800 118 629, [email protected]
Umax Czech a.s., Kolbenova 962/27e, 198 00 Praha 9, Czech Republic

Do not dispose of electrical appliances as unsorted municipal waste, use separate collection facilities. Contact your local authority for information regarding the collection systems available.
If electrical appliances are disposed of in landfills or dumps, hazardous substances can leak into the groundwater and get into the food chain, damaging your health and well-being. Please contact your local or regional waste authority for more information on the collection, reuse, and recycling programs.
Importer hereby declares that this wireless device is in compliance with the essential requirements and other relevant provisions of the R&TTE Directive and Radio Equipment Directive 2014/53/EU, as applicable. A copy of the EU Declaration of Conformity is available at www.umax.cz.
© 2021 Umax Czech a.s. All rights reserved. Umax and the Umax logo are trademarks of Umax Czech a.s. Google Play and the Google Play logo are trademarks of Google LLC. Apple and the Apple logo are trademarks of Apple Inc. All other trademarks are the property of their respective owners.





















