WITHINGS WBS06S Body Personal Scale

Box contents

Quick start
- Pull the tab underneath the scale

- Visit go.withings.com to get the app and follow the instructions.

Know more with Body
Analyze your Body Mass Index and be notified of Rain and Weather Forecast for the day, while weighing.
*Only with Wi-Fi connection
savoir plus sur Body 
Customize your screens
Change the order of the screens and choose what matters most to you.
If you use a Witlings watch, activity tracker or track your steps with the Health Mate™ app, activate the Steps screen to know how much you walked the previous day!

Overview
- Screen
- Feet
- Unit & Pairing button
- Battery cover

Important notice
This product should not be used to diagnose or treat any medical condition.
Information to users in Canada
IC: 11411A-WBS06S
This device complies with Industry Canada’s license exempt RSSs. Operation is subject to the following two conditions:]
- This device may not cause interference; and
- This device must accept any interference, including interference that may cause undesired operation of the device.
Radiation Exposure Statement
The product complies with the Canada portable RF exposure limit set forth for an uncontrolled environment and are safe for intended operation as described in this manual. The further RF exposure reduction can be achieved if the product can be kept as far as possible from the user body or set the device to lower output power if such function is available.
Warranty
Witlings™ Two (2) Years Limited Warranty – Witlings Body
Witlings, 2 rue Maurice Hartmann, 92130 Issy-les-Molineux, (“Witlings”) warrants the Witlings-branded hardware product (“Witlings Product”) against defects in materials and workmanship when used normally in accordance with Witlings’ published guidelines for a period of TWO (2) YEARS from the date of original retail purchase by the end-user purchaser («Warranty Period»). Witlings’ published guidelines include but are not limited to information contained in technical specifications, safety instructions or quick start guide. Witlings does not warrant that the operation of the Witlings Product will be uninterrupted or error-free.
Witlings is not responsible for damage arising from failure to follow instructions relating to the Witlings Product’s use.
Need help?
withings.com/support/body
This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation.
The crossed out wheeled bin symbol on your product, battery and/or accessories means that the item is classified as electrical and electronic equipment. Such items should not be mixed with general household waste, and must be taken to dedicated collection points at the end of their working life for proper treatment, recovery and recycling. This way you help save valuable resources and promote recycling of materials.
Witlings (Part of Witlings) hereby declares that the device Witlings Body is in conformity with the essential requirements and other relevant requirements of Directive 2014/53/EU. The declaration of conformity can be found at: witlings.com/compliance
| Mode | Frequency Band (MHz) | Maximum Output Power (dBm) |
| WLAN | 2412-2472 | 19.9 |
| BT EDR | 2400-2483.5 | 2.87 |
| BT LE | 2400-2483.5 | 8.63 |






















